Performing Maintenance

Procedure
Step 1
Open the access point cover. See
Step 2
Ensure a 6 AWG ground wire is connected to the access point (see
Step 3
Route the power cable through the 1/2-NPT port.
Figure 26: Connecting Internal Ground and DC Power for IW-6300H-DC-x-K9
1
Step 4
Use a wire stripper tool to remove the insulation from each wire. Remove only enough wire to provide adequate
crimp on to ring terminals (Cisco supplied).
Step 5
Remove terminal strip screw and square washer. Connect DC line to terminal strip location. Tighten terminal
strip screws to secure ring terminal and wire.
Step 6
Secure DC input cord to wire tie anchor adjacent to terminal strip.
Step 7
Check your work.
Step 8
Close the access point cover. See

Performing Maintenance

The access point requires minimal periodic or preventive maintenance as it has no moving parts, filters,
lubricants, or mechanical contact components. However, when installed in a hazardous location, periodic
inspections should be conducted in order to ensure that the access point is operating satisfactory. This section
provides information about performing maintenance on an access point installed in a hazardous location.
Additional maintenance information can be found in
a Mesh Network Guide.
Cisco Catalyst IW6300 Heavy Duty Series Access Point Hardware Installation Guide
46
Opening the Access Cover, on page 33
Terminal block
Closing the Access Cover, on page 34
for instructions.
Grounding the Access Point , on page
2
Internal ground
for details.
Chapter 4, "Troubleshooting"
Installing the Access Point
38).
and the Troubleshooting

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents