Working With The Access Cover; Opening The Access Cover - Cisco Catalyst IW6300 Series Hardware Installation Manual

Heavy duty access point
Hide thumbs Also See for Catalyst IW6300 Series:
Table of Contents

Advertisement

Installing the Access Point
Figure 20: Assembled Access Point Hanging in Mounting Bracket
1
2
Step 14
When using the Cisco Aironet Dual-Band Omnidirectional Antennas, connect them to the access point.
Hand-tighten the antennas to the access point.
Step 15
Continue with

Working with the Access Cover

This section details opening and closing the access cover of the access point.

Opening the Access Cover

Caution
The access cover must not be opened unless the area is considered non-hazardous and the AP has been powered
off.
You need to open the access cover to access the AC or DC terminal block, the Ethernet ports, and when you
are installing the fiber-optic SFP module.
Access point
Mount bracket
Grounding the Access Point , on page 38
Cisco Catalyst IW6300 Heavy Duty Series Access Point Hardware Installation Guide

Working with the Access Cover

3
Pole (wood, metal, or fiberglass)2 to 16 in.
(5.1 to 40.6 cm) diameter
4
Stainless steel mounting straps
and
Powering the Access Point, on page
40.
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents