4
Desk Mounting the Chassis
a
Install the base plates.
Remove the mounting ears and install the base plates.
Optional: Installing the E1 Panel
1
Fix the floating nuts.
Mounting hole
Base plate
Floating nut
b
Install the PGND cable.
Secure the PGND cable with the ground screw.
Do not place any objects that may impede heat
dissipation next to the chassis.
16
M4
PGND cable
1.4±0.14 N· M