SETTING THE ANCHORING BASE PLATE INTO THE GROUND FOUNDATION
The first operation is fixing the anchoring base plate on a flat level into a concrete foundation; it is advised that, during this phase,
one or two corrugated tubes, 30 mm of diameter, be laid in the foundation allowing for the electric cables to be driven through
(electric power supply to the installation, command and safety accessories), as illustrated in Pic. 4.
Important: before cementing the anchoring base plate, drive the 2 bolts thoroughly out, to the end of the thread.
!
Important: by means of a spirit level make sure the anchoring base plate be perfectly flat in both directions; it is
also recommended that it be 5 mm higher than the road finish level (Pic. 4).

FITTING THE BEAM

1)
Oil-hydraulic road barrier with beam of 4 meters
Ø 30
2)
Ø 30
3)
4
Two x M14 hook bolts
5 mm
0.0
Road level
Pic. 4