JUKI LZ-271 Instruction Manual page 36

Hide thumbs Also See for LZ-271:
Table of Contents

Advertisement

Available languages

Available languages

BEFORE OPERATION
• Before you put the machine into operation for the first time after the set-up, clean it thoroughly. Remove
all dust gathering during transportation and oil it well.
• Confirm that the voltage has been correctly set. Confirm that the power plug has been properly
connected to the power supply.
• Never use the machine in the state where the voltage type is different from the designated one.
• The direction of rotation of the sewing machine is counterclockwise as viewed from the handwheel side.
Be careful not to allow the sewing machine to run in the reverse direction.
• Never operate the sewing machine unless the sewing machine is sufficiently lubricated.
• For a test run, remove the bobbin and the needle thread.
• Run the sewing machine for the first month at a speed of 1,500 sti/min or less .
• Operate the handwheel after the sewing machine has totally stopped.
CAUTION :
Note that safety devices such as "eye guard", "finger guard", etc. may be omitted from the
illustrations in this Instruction Manual for easy explanation.
When operating the machine, be sure not to remove these safety devices.
CAUTION :
To avoid malfunction and damage of the machine, confirm the following.
v

Advertisement

Table of Contents
loading

Table of Contents