Antenna Relocation Diagram; Ul Requirements - DSC Skyroute Installation Manual

Hide thumbs Also See for Skyroute:
Table of Contents

Advertisement

Antenna Relocation Diagram

5.4 UL Requirements

5.4.1 Grade A - Central Station Service, Residential
Fire and Burglary Installations
• Programming [013] - Option 2 Test Rates must be "ON".
• Every 24 hours a check-in signal must be sent to the central
station. Refer to compatible Listed control unit's installation
instructions for programming.
• Dialing attempts must be programmed for 5 to 10 attempts.
Skyroute transmitter makes 4 attempts which is not
programmable. Refer to compatible Listed control unit's
installation instructions for programming.
• Alarm signals must be sent over both primary and secondary
communication paths -
1.Compatible Listed control unit's land line to central
station (primary).
2. Skyroute transmission through Cellemetry to the
clearing house (Connect 24) (secondary).
• DACT must be enabled for Listed compatible control unit.
5.4.2 Police Station Connect with Basic Line Security
• Same as Grade A Central Station Installations.
7 7 7 7 7

Advertisement

Table of Contents
loading

Table of Contents