BMW MINI Wallbox Plus Installation Instructions Manual page 45

Table of Contents

Advertisement

Safety tests
Before using the device for the first time, check the effectiveness of the system's protective
measure(s) according to national regulations such as ÖVE/ÖNORM E8001-6-61, DIN VDE 0100-600.
Check that the effectiveness of the safety feature(s) of the system complies with national regulations
before commissioning the device.
Electrical systems or devices must be tested by the installer of the system or device before being used
for the first time. This also applies to the extension or modification of existing systems or electrical
devices. However, it must be clearly repeated at this point that compliance with all regulations for the
protection measures is mandatory.
Among others, the following points must be given due consideration:
1. The tests: Continuity of the protective conductor connections, insulation resistance, residual-
current-operated circuit-breaker tripping current and trip time must be conducted for the extended
or modified part.
2. The measuring instruments used must comply with national regulations, for example
DIN EN 60557 (VDE 0413) "Electrical safety in low voltage networks up to AC 1000 V and
DC 1500 V".
3. The meters used must comply with national regulations.
4. The measurements must be documented. A test log must be prepared for the test and archived.
RFID authorisation
The supplied RFID cards are pre-programmed at the factory for all Wallboxes, which means that the
function of the Wallbox Plus is active.
To disable the RFID function or program additional cards, please refer to the programming instructions
in the operating manual.
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mini wallbox essentialWallbox essential

Table of Contents