Disassembly Of The Badu Mat; Assembly Of The Badu Mat - BADU Mat R 41 Translation Of Original Operation Manual

Table of Contents

Advertisement

Available languages

Available languages

Disassembly of the BADU Mat

5
Disassembly of the BADU Mat
1.
Switch the pump off.
2.
If required, close the ball valves in the pipes and drain the
system slightly.
3.
Knock the cylinder pin out of the hand lever.
4.
Remove the washer and store it in a safe place.
5.
Release the 6 or 10 screws on the lid and remove the lid.
6.
Remove the insert with the spring.
7.
Clean the valve, if necessary renew the O-ring in the insert.
6

Assembly of the BADU Mat

1.
Assembly is carried out in reverse order.
2.
Ensure that a new O-ring is placed under the lid. Grease all
O-rings!
3.
The position markings on the lid and housing must sit above
each other.
4.
Tighten the screws evenly in a crosswise sequence.
6 EN
01|2019

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Mat r 51

Table of Contents