General Note; Function - BADU Mat R 41 Translation Of Original Operation Manual

Table of Contents

Advertisement

Available languages

Available languages

General note

1
General note
The BADU Mat 6-way multiport valve is designed to be mounted
directly on the filter housing.
The BADU Mat R 41 has five Rp 1½ inner threads and/or Ø50
glue sockets. The BADU Mat R 51 has five Rp 2 inner threads.
Four housing designs are available for three various installation
positions. For the 3A design, all connections are open with two Rp
1½ or Rp 2 sealing plugs and an O-ring.
NOTICE
Only use Teflon sealing tape to seal the threads. Do not use too
much in ordert o avoid the connections splitting open.
Observe the curing time of at least 12 hours for the glued version!
2

Function

The pump has to be switched off before operating the
BADU Mat. The valve can be brought to the desired position by
pressing down and turning the lever.
If the filter is soiled to such an extent that the filtration flow is no
longer sufficient, proceed as follows:
1.
Switch the pump off.
2.
Turn the lever from the FILTER position to the BACKWASH
position.
3.
Switch the pump on.
4.
Backwash sufficiently. Switch the pump off again. A sight
check can be performed via the inspection glass.
5.
Press and turn the lever once more to select the RINSE
position.
6.
Run the pump briefly to rinse the filter medium through.
7.
Switch the pump off.
8.
Feed fresh water into the pump up to the initial level.
9.
Set the BADU Mat back to the FILTER position and switch
the pump back on.
4 EN
01|2019

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Related Products for BADU Mat R 41

This manual is also suitable for:

Mat r 51

Table of Contents