Download Print this page

Thermador UCVM36FS Installation Manual page 17

Downdraft
Hide thumbs Also See for UCVM36FS:

Advertisement

Available languages

Available languages

Remote Blower (see Figures 11 and 12 for
further detail):
A. Remove junction box cover and connect
conduit with 5 wires from remote blower.
Hook up wires per Wiring Diagramm.
Fig. 10. Replace junction box cover.
B. Attach duct transition at mounting holes
with sheetmetal screws.
C. Feed remote blower pigtail through strain
relief.
D. Attach strain relief to downdraft near
junction box.
gure 11 - Remote Blower
Transition
Transition
CV2T6
DHZDHR6
Fig. 11 – Remote Blower
Integral Blower VTN600CV2C (see Figures
10 and 12 for further detail):
E. Connect pigtail to downdraft at 6 pin
F. Run pigtail wires to juntion box.
G. Inside junction box, connect conduit with
Note: Blower and duct transition box may
be installed with duct outlet left, down or
right. Install blower or duct transition in
such a way that access panels can be
removed for service.
Strain Relief
Remote Blower
Pigtail
connector.
five wires from remote blower. Use a
conduit connector to secure.
6 Pin Connector
Junction Box
Conduit To
Remote Blower
17

Advertisement

loading

This manual is also suitable for:

Ucvm30fs