horizontal and 3 existing vertical control points.
Figure 3.3 15-Point Control Survey Example
Again, if you were to perform this survey with a conventional total station, you would design a
traverse plan which produced a strong looking network of closed-loop traverses through the
points of the survey. Figure 3.4 shows one possible network design.
Figure 3.4 Network Design for 15-Point Control Survey
Surveying with ProMark2
33