The controller will not start a new regeneration cycle without power. If the valve misses a scheduled
regeneration due to a power failure, it will queue a regeneration. Once power is restored, the
controller will initiate a regeneration cycle the next time that the time of day equals the programmed
regeneration time. Typically, this means that the valve will regenerate one day after it was originally
scheduled. If the treated water demand is high and power interruptions are expected, the system
should be set up with a sufficient reserve capacity to compensate for regeneration delays.
7.6.
Remote lockout
If a remote lockout is installed, the controller will not allow the system to go into regeneration until
the regeneration lockout input signal to the controller is cleared. This requires opening the contact
closure to clear the lockout condition. See 4.5.10. Electrical connection, page 38.
7.7.
Sleep mode
The controller will go into sleep mode if no button is pressed after five minutes. All other controller
functions will continue to operate. The display will wake from sleep mode when any part of the display
is touched.