Download Print this page
Newage 24 Gage Steel RTA Base Cabinet Install Instructions Manual

Newage 24 Gage Steel RTA Base Cabinet Install Instructions Manual

Advertisement

Quick Links

24 GAGE STEEl RTA BASE CABINET
Install InstructIons
READ THIS FIRST BEFORE UNPACKING CABINET
All CABINETS mUST BE mOUNTED TO STUDS ON A SECURE WAll, AS PER THESE
INSTRUCTIONS. FAIlURE TO DO SO mAy RESUlT IN SERIOUS INjURy AND vOIDS
PRODUCT WARRANTy AND mANUFACTURER'S lIABIlITy.
WARNING:
DO NOT OvERlOAD CABINETS!
CABINETS ARE DESIGNED TO CARRy
THE FOllOWING mAxImUm WEIGHT
CAPACITIES:
Cabinet
Shelf Weight
Capacity (lbs)
Locker
50
Wall
40
Base
50
PARTS AND HARDWARE SUPPlIED
WITH BASE CABINET:
QTy
ITEm
4
Hinge
47
M5 Frame Screw
47
M5 Frame Nut
4
Adjustable Leg
16
M8 Leg Screws
16
M8 Leg Screw Nut
20
M8 Big Washer
4
Plastic Washer
16
Lock Washers
4
2.5" Wall Screw
4
5/8" Wood Screw
?
need more information
try
Overall Weight
Capacity
200
80
150
ImAGE
, WWW.NEWAGEPRODUCTS.COm
DO NOT lEAvE CHIlDREN UNATTENDED NEAR CABINETS.
WHEN FUlly lOADED, CABINETS ARE HEAvy AND THERE IS A
RISK OF CABINETS OR ITEmS TIPPING IF ImPROPERly OPENED.
WARNING:
ExCESSIvE WEIGHT HAzARD
• Use two or more people to move, assemble or install cabinet or
locker.
• Failure to do so can result in back or other injury.
UNPACKING OF THE CABINET:
• Begin by placing the cabinet on a sound level surface.
• Remove all cardboard and foam packaging material.
• Remove clear plastic bag.
• Dispose / recycle all packaging materials.
• Remove and verify all the contents in the box. See "Parts and
Hardware Supplied List"
1 877 306 8930
or
for answers to commonly asked questions
.

Advertisement

loading

Summary of Contents for Newage 24 Gage Steel RTA Base Cabinet

  • Page 1 24 GAGE STEEl RTA BASE CABINET Install InstructIons READ THIS FIRST BEFORE UNPACKING CABINET All CABINETS mUST BE mOUNTED TO STUDS ON A SECURE WAll, AS PER THESE INSTRUCTIONS. FAIlURE TO DO SO mAy RESUlT IN SERIOUS INjURy AND vOIDS PRODUCT WARRANTy AND mANUFACTURER’S lIABIlITy.
  • Page 2 24 GAGE STEEl RTA BASE CABINET Install InstructIons Top Panel Bottom Panel Left Panel Right Panel Left Back Panel Right Back Panel Shelf Left Door Right Door , WWW.NEWAGEPRODUCTS.COm 1 877 306 8930 need more information for answers to commonly asked questions...
  • Page 3 24 GAGE STEEl RTA BASE CABINET Install InstructIons Use the M5 screw and M5 nut to Assemble the left and right assemble the two back panels. side panel with the same screw and nut. D Goes on the outside of E, and C goes on the outside of F.
  • Page 4: Installing Shelves

    24 GAGE STEEl RTA BASE CABINET Install InstructIons ASSEmBly INSTRUCTIONS: INSTAll THE HEIGHT-ADjUSTABlE STEEl lEvElING lEGS: (for all cabinets except for wall cabinet) 1. Open the cabinet and remove any loose shelves, support brackets, etc. 2. Close / lock the cabinet drawers.
  • Page 5 Give us your feedback for a chance to WIN! Take our quick 2 minute survey and enter for your chance to win something FREE from NEWAGE! Visit the website for details at www.newageproducts.com 7. Once leveled, using the supplied mounting hardware fasten a 2.5”...
  • Page 6 Products Inc. wIll not Pay for: Service calls to correct the installation of any NewAge products or to instruct you how to use or install them. Damage resulting from improper handling or shipping of products, or products damaged by accident, misuse, abuse, fire, flood, improper installation, acts of God, neglect, corrosion, modification or mishandling.