Preparing For Operation - Siemens SIMATIC Rack PC IL 40 Getting Started

Intel pentium 4 platform, first steps in commissioning
Table of Contents

Advertisement

Commissioning
2.3

Preparing for Operation

Connection to the Power Supply Unit
The AC power supply unit of the Rack PC IL is designed for 115/230V systems.
Voltage selection is carried out automatically.
1. Plug the supplied power cable into the appliance connector.
2. Connect the unit to a socket outlet with a grounded protective conductor.
3. Fasten the power plug using power plug clamp supplied.
Warning
!
The Rack PC IL is equipped with a safety-tested mains cable and may only be
connected to a grounded grounding outlet.
Make sure that the socket on the device or the grounding outlet of the building
installation is easily accessible and as near as possible to the device.
The mains plug must be pulled out for complete mains separation. This point
must be easily accessible. If the PC is installed in a cabinet, there must be a
central mains disconnector.
Notice
Rack IL 40 starts to run as soon as it is connected to the power supply. Press
the ON/OFF button to switch it off again.
Connecting the Peripheral Units and Switching on the Rack PC IL
Before you connect the Rack PC IL to the mains, the peripheral units mouse,
keyboard and monitor must be connected.
1. Insert the connector cable of the peripheral units into the corresponding
sockets on the port side of the Rack PC IL (see Section 2.6.)
2. Press the On/Off button behind the front door, the PC is in operation. The
Power LED lights green.
Power LED
SIMATIC Rack PC IL 40, Getting Started
A5E00171493-02
On/Off
button
2-5

Advertisement

Table of Contents
loading

Table of Contents