Download Print this page
Kohler TOOBI II Series Installation Instructions Manual

Kohler TOOBI II Series Installation Instructions Manual

Vanity tops & cabinets

Advertisement

Quick Links

BEFORE YOU BEGIN
Please read these instructions carefully to familiarize yourself with the required tools, materials, and
installation sequences. Follow the sections that pertain to your particular installation. This will help you
avoid costly mistakes.
All information in these instructions is based upon the latest product information available at the time of
publication. Kohler NZ reserves the right to make changes in product characteristics, packaging, or
availability at any time without notice.
These instructions contain important care, cleaning, and warranty information - please leave instructions
for the consumer.
Turn off the water supply.
The plumbing installation must comply with Water Supply Regulations / Bylaws. The installation of the
waste and tapware must be carried out by a plumber.
Before installation carefully inspect the vanity for any signs of damage, if damage has occurred do not
proceed with the installation, and advise your supplier immediately.
ORDERING INFORMATION
This installation covers the following products in the TOOBI
TOOBI
600 Single Drawer Vanity - Slate................................................25802A-NA
II
TOOBI
600 Single Drawer Vanity - Midnight...........................................25803A-NA
II
TOOBI
600 Single Drawer Vanity - Sand Dune......................................25804A-NA
II
TOOBI
600 Vanity With Top Utility Drawer - Slate..................................25805A-NA
II
TOOBI
600 Vanity With Top Utility Drawer - Midnight............................ 25806A-NA
II
TOOBI
600 Vanity With Top Utility Drawer - Sand Dune........................25807A-NA
II
TOOBI
900 Single Drawer Vanity - Slate................................................25808A-NA
II
TOOBI
900 Single Drawer Vanity - Midnight...........................................25809A-NA
II
TOOBI
900 Single Drawer Vanity - Sand Dune......................................25810A-NA
II
TOOBI
900 Vanity With Top Utility Drawer - Slate..................................25811A-NA
II
TOOBI
900 Vanity With Top Utility Drawer - Midnight............................25812A-NA
II
TOOBI
900 Vanity With Top Utility Drawer - Sand Dune........................25813A-NA
II
SAFETY WARNING
Kohler products are should give continued superior and safe performance, provided:
1. They are installed, commissioned, operated and maintained in accordance with the recommendations
given in this Manual.
2. Periodic attention is given, as necessary, to maintain the products in good functional order. Refer to
'User Information' on page 6 of this manual.
3. When installing Kohler Products, manufacturers guidelines for power tool safety should be followed.
1403098-A02-A
range:
II
-1-
TOOBI
INSTALLATION INSTRUCTIONS
VANITY TOPS & CABINETS
II

Advertisement

loading
Need help?

Need help?

Do you have a question about the TOOBI II Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Kohler TOOBI II Series

  • Page 1 All information in these instructions is based upon the latest product information available at the time of publication. Kohler NZ reserves the right to make changes in product characteristics, packaging, or availability at any time without notice.
  • Page 2: Plumbing Installation

    CABINETRY ROUGH-IN Reference Value UNIT : mm Kohler reserves the right to change marked dimensions without prior notice. PLUMBING INSTALLATION (a) Install the services. Hot and Cold inlets must be connected to the correct inlet pipes. Overflow (b) Install the waste in accordance with the manufacturers instructions together with the overflow kit as shown in Fig.
  • Page 3: Installation

    CO C ONSTRUCTION REQUIREMENTS Toobi II cabinets must be fixed to two nogs in the wall, the nog size should be 50 x 75mm. 50mm from top of cabinet to centre of nog. 750 - 800 A height of 750 to 800mm from the floor to the top of the cabinet is recommended.
  • Page 4 INSTALLATION Water supply and waste pipe holes (a) Measure and mark the centres for water supply & waste pipes on the back of the cabinet. With a suitably sized hole saw drill the holes for the water supply and waste. Fig.
  • Page 5 - Between the vanity top and wall Drain Assembly P Trap Fig. 3 6 Drawer re-installation (a) To re-install the drawers, extend the runners and place the drawer onto the runners. INSTALLATION COMPLETE Please visit our website for warranty information: Kohler NZ Kohler Australia www.kohler.co.nz www.kohler.com.au...
  • Page 6: User Maintenance

    Tilt back-and-forward USER MAINTENANCE 1) Regular cleaning of your Kohler product is recommended and will help to avoid the build up of dirt and grime that can damage and reduce the life of the product. 2) Do not use cleaning products containing:...

This manual is also suitable for:

Toobi ii 600Toobi ii 900