Buderus Logano GE315 Installation And Maintenance Instructions Manual page 47

Cast iron sectional boiler for oil or gas pressure jet burners
Table of Contents

Advertisement

Maintenance
Demand-dependent maintenance work
1.
System shutdown
2.
Remove and clean the hot gas baffle plates
3.
Clean the hot gas flues (heating surfaces)
4.
Clean the combustion chamber
5.
Clean the flue gas collector
6.
Install the hot gas baffle plates
Check and, if required, replace gaskets/packing cord on
7.
burner and burner door
8.
System start-up
Final check of the maintenance work; document the
9.
measurement and test results
10. Check the function and safety in operation
Confirm the professional maintenance with signature, date and company stamp
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano GE315 • Issue 02/2006
Page
(individual steps)
page 38
page 41
page 42
page 42
page 42
page 22
See burner documentation
page 33
See burner documentation
See burner documentation
Comments
6
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents