Installation sequence
Electrical connections
H Jumper
1. Connect the heat generator control
unit and the room temperature con-
troller.
Connecting the on-site switching contact
Connection at terminals 7 and 8
On-site switching contact: Floating con-
tact, electrically isolated
Assembling the controller
14
(cont.)
2. Remove jumper H.
The following functions can be connec-
ted:
■ Window contact (operation with frost
protection temperature when contact
is open)
■ Telephone contact (telephone remote
switch)
■ Presence detector (switching contact)