Chapter 2: Server Installation; 2-1 Overview; Unpacking The System; Preparing For Setup - Supero SUPERSERVER 6015B-Ni User Manual

Super switch user's manual
Table of Contents

Advertisement

2-1 Overview

This chapter provides a quick setup checklist to get your SuperServer 6015B-Ni
up and running. Following these steps in the order given should enable you to
have the system operational within a minimum amount of time. This quick setup
assumes that your SuperServer 6015B-Ni system has come to you with the proces-
sors and memory preinstalled. If your system is not already fully integrated with a
serverboard, processors, system memory etc., please turn to the chapter or section
noted in each step for details on installing specifi c components.
2-2

Unpacking the System

You should inspect the box the SuperServer 6015B-Ni was shipped in and note if
it was damaged in any way. If the server itself shows damage you should fi le a
damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the SuperServer 6015B-
Ni. It should be situated in a clean, dust-free area that is well ventilated. Avoid
areas where heat, electrical noise and electromagnetic fi elds are generated. You
will also need it placed near a grounded power outlet. Read the Rack and Server
Precautions in the next section.
2-3

Preparing for Setup

The box the SuperServer 6015B-Ni was shipped in should include two sets of rail
assemblies, two rail mounting brackets and the mounting screws you will need to
install the system into the rack. Follow the steps in the order given to complete
the installation process in a minimum amount of time. Please read this section
in its entirety before you begin the installation procedure outlined in the sections
that follow.
Chapter 2
Server Installation
2-1

Chapter 2: Server Installation

Advertisement

Table of Contents
loading

Table of Contents