Download Print this page

Carrier 30AWH-025QI Installation Manual page 18

Inverter hybrid boiler
Hide thumbs Also See for 30AWH-025QI:

Advertisement

● Installation should be performed by the authorized service center or by a professional
installation agency that has been certified by Carrier.
● This product requires a seperate power supply (400V 50Hz 3-phase 4-wire AC electricity).
A dedicated circuit must be used in the power supply of the hybrid boiler.
● Make sure all of the following components are in place before installing the product.
Installation kits materials
NO
Component name
1
Drain Pan
2
Drain Pan installation Manual
3
Finishing tape
4
Pipe finishing materials
5
Other materials
6
Domestic hot water tank temperature sensor well
7
Domestic hot water tank temperature sensor
8
Connector for error output
Installation materials (optional)
NO
1
Refrigerant connection pipe
2
Refrigerant connection pipe
3
Insulator for refrigerant pipes
4
Insulator for refrigerant pipes
Indoor/outdoor unit connection power cable
5
(3-phase power cable)
6
Indoor/outdoor unit communication cable
7
Copper pipe processed article
16
Inverter Hybrid Boiler
Component name
Specifications
Quantity
PP
PAPER
PVC FILMa, 30M IVORY
CN25
SCREW, GROMMET
WELL, PT1/2
10Kohm, L200
12PIN, L300
Specifications
OD 9.52mm X 10m
OD 15.8mm X 10m
ID 14 X T7 X 5m
ID 14 X T7 X 5m
2.5 ㎟ X 5G X 11m
CVV-SB(shield cable) 1.5㎟ X 2C X 11m
PAPER PIPE, ID230 X T3
Remarks
2
1
1
1
1
1
1
1
Quantity Remarks
1
liquid pipe
1
gas pipe
2
2
1
1
1

Advertisement

loading

This manual is also suitable for:

30awh-025qo