Wiring - Bosch FWA 4650 Initial Operation And Retrofit Kit

Wlan-box for 3d-12cam wheel alignment system
Hide thumbs Also See for FWA 4650:
Table of Contents

Advertisement

Available languages

Available languages

en
50 | FWA 4650 | Preparation for installation
3
2
Fig. 5:
Drilling pattern for WLAN-Box fastening strips
1 Hole spacing = 620 mm
2 Through-hole (2 x), drill hole dia. = 9 mm
3 Fastening strip (2 x)
1. Drill 2 holes.
i
Holes:
Diameter
9 mm
Tab. 11:
Holes (2 x) for attaching WLAN-Box
2. Place the WLAN-Box in position.
3. Insert hexagon socket countersunk bolts
(2 x M 8 x 2.5 mm) through the fastening strips (2 x)
of the WLAN-Box and through the holes (2 x) in the
control column.
4. Fit the hexagon socket countersunk bolts with
hexagon nuts (2 x M 8).
"
This completes fitting of the WLAN-Box.
|
1 690 706 220
2016-09-14
1
Spacing
620 mm
5.1.2

Wiring

1. Unfasten the screws (6 x) securing the housing cover
of the WLAN-Box.
1
2
Fig. 6:
Removing WLAN-Box housing cover
1 Housing cover
2 Securing screws (6 x)
2. Detach the cover.
3. Remove the cable glands (2 x) from the WLAN-Box.
4. Take the cable glands (2 x) apart.
i
The cable glands can be opened up for routing
the individual wires through the grommets. They
also seal the box and provide strain relief for the
connecting cables.
i
Cable gland:
Components
Lock nut
Seal
Housing half with U-clip
Housing half
Grommet
Plug
Tab. 12:
Components of two-piece WLAN-Box cable gland
Quantity
1
1 with 4 cable penetrations
1
Robert Bosch GmbH

Advertisement

Chapters

Table of Contents
loading

Table of Contents