Re-Installation Of The Weigh Bin Assembly - Maguire Products S-BLENDER Supplimental Documentation

Table of Contents

Advertisement

Maguire S Blender

Re-Installation of the Weigh Bin Assembly

1. To re-install the Weigh Bin, hold the dump flap
closed while guiding the weigh bin into the Frame
Assembly. Orient the Weigh Bin so that the Dump
Valve air hose is to the left and closest to you.
NOTE: When re-installing the weigh bin, be
certain that the weigh bin is properly
seated on both load cells and is behind the
stop screw as pictured to the right.
When closing the front access panel, be
sure to check the door hinge for any pellets
or debris and clear any from the hinge are
before closing the door. Pellets and debris
trapped in the hinge will cause it not to
close properly. Forcing it to close with
pellets trapped in the hinge can damage
the door.
2. Close the Back Door Assembly and close the latch.
9
Maguire Products, Inc.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents