Download Print this page
LEGRAND CHIEF PACFCB Installation Instructions Manual

LEGRAND CHIEF PACFCB Installation Instructions Manual

Floor to ceiling back to back accessory

Advertisement

Quick Links

I N S T A L L A T I O N I N S T R U C T I O N S
Instrucciones de instalación
Installationsanleitung
Instruções de Instalação
Floor to Ceiling Back to Back Accessory
Istruzioni di installazione
Installatie-instructies
Instructions d´installation
Spanish Product Description
German Product Description
Portuguese Product Description
Italian Product Description
Dutch Product Description
French Product Description
PACFCB

Advertisement

loading
Need help?

Need help?

Do you have a question about the CHIEF PACFCB and is the answer not in the manual?

Questions and answers

Summary of Contents for LEGRAND CHIEF PACFCB

  • Page 1 I N S T A L L A T I O N I N S T R U C T I O N S Instrucciones de instalación Istruzioni di installazione Installationsanleitung Installatie-instructies Instruções de Instalação Instructions d´installation Floor to Ceiling Back to Back Accessory Spanish Product Description German Product Description Portuguese Product Description...
  • Page 2: Important Safety Instructions

    (58.9 kg) or 65 lbs (29.5 kg) per display. contingency in connection with the installation or use of this product. The information contained in this document is subject to change without notice or obligation of any kind. Legrand WARNING: Use this accessory only for its intended use as makes no representation of warranty, expressed or implied, described in these instructions.
  • Page 3 Installation Instructions PACFCB DIMENSIONS 127.76 5.03 355.60 14.00 623.57 24.55...
  • Page 4 PACFCB Installation Instructions LEGEND Tighten Fastener Pencil Mark Apretar elemento de fijación Marcar con lápiz Befestigungsteil festziehen Stiftmarkierung Apertar fixador Marcar com lápis Serrare il fissaggio Segno a matita Bevestiging vastdraaien Potloodmerkteken Serrez les fixations Marquage au crayon Loosen Fastener Drill Hole Aflojar elemento de fijación Perforar...
  • Page 5: Tools Required For Installation

    Installation Instructions PACFCB TOOLS REQUIRED FOR INSTALLATION 5/32” (included) 1/8" (included) PARTS E (1) - Display interface + hardware (See below) B (10) [Cable tie] C (4) D (1) #10-24 x 1/2" A (1) 5/32" [PACFCB accessory] PARTS - DISPLAY INTERFACE Hardware Kit Bag A Bag C...
  • Page 6: Display Installation

    PACFCB Installation Instructions Assembly And Installation Display Installation Connecting to FSC1U Use four #10-24 x 1/2" button head cap screws (C) to WARNING: Exceeding the weight capacity can result in secure PACFCB accessory to FCS1U outer frames. (See serious personal injury or damage to equipment! It is the Figure 1) installer’s responsibility to make sure the combined weight of all components attached to the FSC1U mounting system...
  • Page 7 Installation Instructions PACFCB 10. Select correct screws, nesting spacers (if necessary) and universal washers (if required) from the hardware bag (EA- EM) and attach brackets to back of screen. (See Figure 5) IMPORTANT ! : The M8 screws do NOT require a washer.
  • Page 8 PACFCB Installation Instructions 13. Determine and mark the horizontal center position between the Left and Right TOP mounting holes in display. (See Figure 6) 14. Determine and mark the horizontal center position between the Left and Right BOTTOM mounting holes in display. (See Figure 6) 15.
  • Page 9 Installation Instructions PACFCB 20. Lift display onto mount, carefully placing mounting buttons into mounting locations on faceplate. (See Figure 8) 21. Slide locking plate over mounting buttons to secure display to mount. (See Figure 8) Figure 8 22. Tighten two turnbuckles (included with FCS1U) until cables are tight and mount is level.
  • Page 10 PACFCB Installation Instructions...
  • Page 11 Installation Instructions PACFCB...
  • Page 12: Installation Instructions

    Europe A Franklinstraat 14, 6003 DK Weert, Netherlands P +31 (0) 495 580 852 F +31 (0) 495 580 845 8800-003173 Rev00 2019 Legrand Asia Pacific A Office No. 918 on 9/F, Shatin Galleria 18-24 Shan Mei Street www.legrandav.com Fotan, Shatin, Hong Kong...