Space Requirements - Samsung MCU-R4NEK0N Installation Manual

Hr changer
Table of Contents

Advertisement

Space requirements

Space requirements
1. Since refrigerant noise can be generated during the HR Changer operation, do not install the unit on the ceiling of
may disturb people in that area and cause inconvenience.
<Spaces with developed ceiling>
<There is no risk of noise transfer>
(Bricks, Concretes, Cement)
function.
gap to prevent noise from leaking.
12
English
HR Changer
Bulkhead
Hallway
HR Changer
Hallway
<There is a risk of noise transfer>

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents