Rheem Solar Premier Loline 590160 Owner's Manual And Installation Instructions page 41

Storage tank
Table of Contents

Advertisement

To connect the preformed copper pipe to the solar storage tank and in-series gas booster:
Fit the ¾" x ½" hex nipple (1) to the solar heated water outlet of the solar storage tank.
Fit the ½" F x ½" M elbow (2) to the hex nipple at the solar heated water outlet of the solar storage tank.
Fit one end of the ½" x ½" female cone braided flexible hose assembly (3) to the ½" F x ½" M elbow (2).
Fit the ½" M x ½" C elbow fitting (4) to the other end of the braided flexible hose.
Connect the short end of the insulated DN15 preformed pipe (5) to the ½" M x ½" C elbow (4) using the
compression nut and olive provided with the elbow.
Connect the other end of the DN15 preformed pipe to the inlet of the in-series gas booster using the
¾" F x ½" C fitting union (6) and the compression nut and cone olive provided.
SUPPLIED WITH 590160 SOLAR STORAGE TANK – KIT 299662
Part
Item
Description
Number
hex nipple ¾" M x ½" M
1
088143
elbow ½" F x ½" M Rye 2503
2
088150
3
088152
braided flexible hose 272 mm long
12 mm x ½" female cone
elbow fitting ½" M x ½" C Rye 4940
4
088151
Note: Items 1, 2, 4, 6 are in kit 299870, which is part of kit 299662
Other items supplied in kit 299870, outlined in
2 x 088065 fitting (compression) union ½" C x ½" C Rye 4930
Other items supplied in kit 299651, outlined in
3 x 080221 cable tie mounts
IN-SERIES BOOSTER – REMOTE LOCATION
The pipe work between the solar storage tank and the in-series gas booster has a minimum recommended
pipe size of DN20, MUST BE of copper and be fully insulated with a closed cell type insulation or equivalent
in accordance with the requirements of AS/NZS 3500.4.
The insulation must be weatherproof and UV resistant if exposed. The insulation must be fitted up to the
connections on both the solar storage tank and the in-series gas booster. A full flow isolation valve must be
installed on the water line to the in-series gas booster.
GAS INLET
The gas connection is made at the underside of the in-series gas booster. The pipe work must be cleared of
foreign matter before connection and purged before attempting to operate the water heater. An isolation valve
and disconnection union must be installed to allow servicing and removal of the water heater.
Note: Refer to the Gas Installations Standard AS 5601 or AS/NZS 5601.1 for the correct method of sizing the
gas supply pipe to the water heater. The pipe size selection must take into account the high gas input of the
in-series gas booster
(refer to table on page 30)
Warning: Always isolate the in-series gas booster before pressure testing the gas supply system.
Disconnect the in-series gas booster after the isolating cock to prevent the risk of serious damage to the gas
control. The Rheem warranty does not cover damage of any nature resulting from failure to observe this
precaution. Refer to rating label for gas types and pressures.
Item
5
6
7
8
"Solar Inlet and Outlet"
"Hot Sensor Lead"
1 x 053114 hot sensor gland
as well as all of the other gas appliances in the premises.
41
CONNECTIONS – PLUMBING
Part
Description
Number
088190
preformed pipe DN15,
insulated with 13 mm diam insulation
fitting union ¾" F x ½" C Rye 5202
088144
080031
screw phillips pan HD No 8 x 13 (2 off)
080187
screw HD bolt M6 x 12
on page 43, are:
on page 45, are:
9 x 080231 cable ties 150 mm x 3 mm

Advertisement

Table of Contents
loading

Table of Contents