Connection To Silver C Air Handling Unit; Cool Dx, Sizes 020-040 - Swegon COOL DX 008 Installation And Maintenance Instructions Manual

Table of Contents

Advertisement

3.3.3

Connection to SILVER C air handling unit,

COOL DX, sizes 020-040

The sealing strips are factory-fitted to the unit.
Dock the chiller directly to the SILVER C air handling unit
by means of the supplied bolts (4 bolts) + pre-fitted rivet
nuts.
To secure accessories to the rear edge
Alternative 1, External installation
Illustration 1
COOL DX chiller, rear
Alternative 2, Internal installation
Illustration 2
To secure accessories to the front edge
Illustration 3
10
www.swegon.com
Option 1
If there is sufficient space for working from the rear of the
air handling unit, the simplest way to secure the chiller at
the rear edge of the SILVER C air handling unit is by exter-
nally jointing it, see Illustration 1.
Secure the chiller to the front edge of the SILVER C air
handling unit within the unit via the inspection cover, see
Illustration 3.
Option 2
The chiller is secured to the back edge of the SILVER C
air handling unit within the casing, see Illustration 2. This
requires removal of the fan assembly and filter cassettes.
Secure the chiller to the front edge of the SILVER C air
handling unit within the unit via the inspection cover, see
Illustration 3.
The SILVER C air handling unit, rear
Remove the cover and insulation. Secure the chiller to the SILVER C air handling unit
with the bolts supplied and pre-fitted rivet nuts. Refit the blanking plate and the
insulation.
COOL DX Chiller
In this case, fastening is done with the bolts supplied and pre-fitted rivet nuts in
predrilled holes.
COOL DX Chiller
In this case, fastening is done with the bolts supplied and pre-fitted rivet nuts in
predrilled holes.
GB.COOLDX.SI.G.190603
We reserve the right to alter specifications.

Advertisement

Table of Contents
loading

Table of Contents