Mira Discovery Installation And User Manual page 14

Shower valve
Table of Contents

Advertisement

Caution! It is essential at this point
that the supply pipework is thoroughly
flushed through before connection to
the Shower Control. Failure to do so
may result in product malfunction.
1.9 Put the Compression Nuts and Olives
onto the pipework.
1.10 Remove the Elbow Shrouds from the
Shower Control.
1.11 Align the Shower Control with the
pipework and fit onto the Backplate.
1.12 Tighten the Compression Nuts onto
the Shower Control with the Spanner
(supplied).
Caution! Take care not to damage the
chrome surfaces.
1.13 Tighten the Grubscrew to secure the
Shower Control to the Backplate.
1.14 Fit the Shower Fittings, refer to your Fittings Installation and User Guide for
instructions.
1.15 Turn on the hot and cold water supplies and check for leaks.
1.16 Refit the Elbow Shrouds.
1.17 The Shower Control is preset to approximately 43 °C at the factory. If adjustment
is required, refer to section: 'Commissioning'.
For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - info@mytub.co.uk 0844 556 1818
Compression Nut
14
Secure the Control
to the Backplate with
the Grubscrew
Olive
Elbow Shrouds

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents