Commissioning Report - Hamworthy Trigon ST1 Installation, Commissioning, Operation & Service Instructions

Solar pump station
Table of Contents

Advertisement

9 Commissioning report

Installation operator
Location of installation
Collectors
(number / type)
Collector surface
Installation height
Pipes
Venting
(collector field)
De-aerator
(station)
Solar fluid (type)
Antifreeze tested up to:
Flow rate
Pump (type)
Pump speed level
(I, II, III)
System pressure
Expansion vessel (type)
Initial pressure
Pressure relief valve
Check valves
Plumbing company
24
m
=
mm
⃞ Manual vent valve
⃞ No
⃞ Vented
°C
l/m
mbars
mbars
Checked
Checked
Installation-Operation ST1 Solar Pump Station
(Difference in height between
station and collector field)
l =
Station
Controller
Software version
Restrictor
position:
Date, signature
9 Commissioning report
Automatic deaerator
Vented
% glycol
S e r i a l n u m b e r s
0DNO0201
m

Advertisement

Table of Contents
loading

Table of Contents