WARNING
Risk to life and limb due to electric shock!
Prior to commencing electrical work on the controller, disconnect the mains
Only after completing all installation work, flushing and filling, plug the
10
plug from the mains
mains plug of the controller into a socket! This avoids an unintentional start
of the motors.
9. Connect the pump and the sensors to the controller.
The assembly of the solar station is completed and you
can put the station into operation.
Installation-Operation ST1 Solar Pump Station
3 Assembly and installation [installer]