Electrical Installation; Electrical Installation Of The Versapoint Station; Electrical Installation Of The Safety Module - GE VersaSafe VersaPoint Series User Manual

Safety logic modul , safe output 24vdc, 8pt
Table of Contents

Advertisement

4
4-6
4.2

Electrical installation

WARNING: Electric shock/unintentional machine startup
Prior to electrical installation, disconnect the power to the system and make sure that it
cannot be switched on again unintentionally.
Make sure installation has been completed before switching the power back on.
The system may only be started provided the system does not pose a hazard.
4.2.1

Electrical installation of the VersaPoint station

Electrical installation of the VersaPoint station includes the following:
Connecting the bus system to the VersaPoint station
Connecting the supply voltages for the VersaPoint station
Carry out electrical installation for the VersaPoint station according to the GFK-2736 user
manual or the VersaPoint system manual for your bus system. Please also observe the
specifications in the documentation for the bus coupler used.
4.2.2

Electrical installation of the safety module

During installation, always observe the instructions in "Electrical safety" on page 1-2.
Take measures to prevent the incorrect connection, polarity reversal, and manipulation
of connections.
The supply voltages are supplied at a bus coupler and/or a power terminal and are supplied
to the safety module via the potential jumpers. Therefore, the electrical installation of the
safety module only involves connecting the actuators.
The actuators are connected via VersaPoint connectors.
Wire the connectors according to your application. For the terminal point assignment,
please refer to "Terminal point assignment" on page 3-3.
For wiring, proceed as follows:
Strip 8 mm off the cable.
VersaPoint wiring is normally done without ferrules. However, it is possible to use
ferrules. If using ferrules, make sure they are properly crimped.
Push a screwdriver into the slot of the appropriate terminal point (Figure 4-6, detail 1),
so that you can insert the wire into the spring opening.
GE Intelligent Platforms recommends the SZF 1 - 0.6X3.5 screwdriver.
Insert the wire (Figure 4-6, detail 2). Remove the screwdriver from the opening. This
clamps the wire.
User manual IC220SDL953 - September 2011
GFK-2731

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ic220sdl953

Table of Contents