Configuration - ABB M2306 Product Manual

Lift control module
Hide thumbs Also See for M2306:
Table of Contents

Advertisement

ABB-Welcome
9.2

Configuration

Basic Steps
Step 1: Set basic param eters of the apartment using the ABB-W elcome configuration tool.
Fig. 15
No.
1
2
3
4
5
6
7
8
1
2
5
7
8
Function
Select building number.
Select floor number.
Select apartment number.
Set physical address (e.g., 13 means the IS address set by IS switches)
Set user name
Set logic address (e.g., 0703 means 7th floor, apartment number 3).
Add data from one apartment to project.
Upload configuration to system
3
4
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

M2307

Table of Contents