ABB M2306 Product Manual

Lift control module
Hide thumbs Also See for M2306:

Advertisement

VER:1.3 │
│ 28.04.2017
ABB-Welcome
Pos: 2 /DinA4 - Anl eitun gen Online /Inh alt/KNX/Doo rEntry /832 20-AP- xxx/Tit elblat t - 832 20-AP-xxx - ABB @ 1 9\m od_ 132 3249 806 476 _15. docx @ 11 108 4 @ @ 1
Lift control module
M2306
M2307
=== E nde der Liste für Tex tma rke C over == =

Advertisement

Table of Contents
loading

Summary of Contents for ABB M2306

  • Page 1 ABB-Welcome Pos: 2 /DinA4 - Anl eitun gen Online /Inh alt/KNX/Doo rEntry /832 20-AP- xxx/Tit elblat t - 832 20-AP-xxx - ABB @ 1 9\m od_ 132 3249 806 476 _15. docx @ 11 108 4 @ @ 1 Lift control module...
  • Page 2: Table Of Contents

    Pos: 4 /Busc h-Ja ege r (N eust rukt ur)/ Mo dul-St ruktu r/Onli ne-D oku ment ation /Inh altsve rzeich nis ( --> Fü r alle Doku men te <-- )/In haltsve rzeic hnis @ 19\ mod _13 206 490 4438 6_1 5.d ocx @ 109 653 @ @ 1 Safety ....................... 3 Environment ....................3 ABB devices ................3 Technical data................... 4 Function ....................5 Connection ....................
  • Page 3: Safety

    Therefore, dispose of the device at the appropriate recycling facility. Pos: 12 /Di nA4 - A nleitu ngen Onlin e/Ueb ersc hrift en/2 ./ABB Gera ete @ 19 \mo d_1 323 162 843 832_ 15. docx @ 11 087 5 @ 2 @ 1 ABB devices Pos: 13 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Umw elt ( -->...
  • Page 4: Technical Data

    2 x 0.28 mm - 2 x 0.75 mm; Bus voltage 20-30 V DC Size 4 TE Protection IP 20 Operating -25 °C - +55 °C temperature M2306: 90 mm x 72 mm x 65 mm Size M2307: 216 mm x 110 mm x 45 mm...
  • Page 5: Function

    Pos: 22 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n ( --> Fü r alle Doku men te < -- )/2. E bene /G - L/L asta rten @ 2 0\m od_1 326 269 704 379 _15. docx @ 13 690 5 @ 2 @ 1 The lift control modules include the M adaptor (M2306) and lift control relay module (M2307). These two devices together ensure that lift (elevator) only goes to authorized floor(s).
  • Page 6: Connection

    Connection M2306 Pos: 31 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Anschl uss/Dim me r/Anschl uss - 659 1 U- 101 @ 23 \mo d_1 333 0939 200 08_ 15.d ocx @ 207 132 @ @ 1 Fig.
  • Page 7: M2307

    - ON = Power on - OFF = Power off Setting LED - Blinks when working normally Address Set the module address The address range is 1-16.Only the left 4 bits are used. Power supply Connect with M2306 Connect with the lift controller...
  • Page 8 ABB-Welcome Pos: 24 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Steu er mod ule - Onlin e-Dok ume ntati on ( -- > F ür alle Dok ume nte <- -)/ +++ ++ ++ +++ ++ S eiten umb ruch + +++ ++ ++ +++ + @ 9\m od_ 126 8898 668 093 _0. docx @ 521 49 @ @ 1...
  • Page 9: Lift Control Relay Module Address By Binary Setting

    ABB-Welcome Lift control relay module address by binary setting Fig. 3 · Installer needs only read the labeling on the lift control module and adjust according to the given position. · Only digits 1-2-3-4 are used.
  • Page 10: Mounting/Installation

    ABB-Welcome Mounting/Installation Pos: 34 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Siche rheit (- -> Fü r alle D oku ment e < --) /War nhinweis e/Siche rheit - Nie ders pan nun gs- und 230 V-Leit ung en @ 18\ mod _13 026 178 214 91_1 5.d ocx @ 103 465 @ @ 1...
  • Page 11 ABB-Welcome Electric voltage! Install the device only if you have the necessary electrical engineering knowledge and experience. • Incorrect installation endangers your life and that of the user of the electrical system. • Incorrect installation can cause serious damage to property, such as a fire.
  • Page 12: Mounting

    The device must only be installed on mounting rails according to DIN EN 50022. It is highly recommended that M2306 be installed in the lift motor room on the top floor or the electrical riser, while M2307 should be installed in the lift cabin.
  • Page 13: User Case

    High building (no more than 16 floors) with one lift One M2306 and one M2307 Pos: 41 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/In bet riebn ahm e/Dim me r/Inb etri ebn ahm e - 659 1 U-1 01 @ 19\ mo d_1 3119 487 810 23_ 15.d ocx @ 108 300 @ 2 22 @ 1...
  • Page 14 ABB-Welcome Wiring with one M2306 and one M2307 Fig. 7...
  • Page 15: High Building (More Than 16 Floors) With One Lift

    ABB-Welcome High building (more than 16 floors) with one lift one M2306 and multi (up to 16) M2307 Fig. 8: Topology...
  • Page 16 Fig. 9 Notes: 1.The first mini system controller (M2301) feeds one M2306 and one M2307. 2. An additional M2307 should be locally powered by one mini system controller. Eg. with (4) M2307 and (1) M2306, 4 mini system controllers are needed.
  • Page 17: High Building (More Than 16 Floors) With Two Lifts

    ABB-Welcome High building (more than 16 floors) with two lifts one M2306 and multi M2307 support 2 lifts Fig. 10: Topology Note: The address code can not be repeated.
  • Page 18: High Building (More Than 16 Floors) With Four Lifts

    ABB-Welcome High building (more than 16 floors) with four lifts Two M2306 and multi M2307 support 4 lifts Fig. 11: Topology Pos: 42 /Busch-Jaeger (Neustruktur)/Modul-Struktur/Online-Dokumentation/Steuermodule - Online- Dokumentation (--> Für alle Dokumente <--)/++++++++++++ Seitenumbruch ++++++++++++ @ 9\mod_1268898668093_0.docx @ 52149 @ @ 1...
  • Page 19: Operation

    User scenario illustration of visitor target floor 5. The visitor 2. The resident presses the "unlock" button reaches the at any ABB-Welcome indoor station. 12th floor. 4. Within a set of time (default of 10 minutes), the visitor can only activate the 12th floor.
  • Page 20: User Scenario Illustration Of Resident Target Floor

    ABB-Welcome Pos: 43 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n ( --> Fü r alle Doku men te < -- )/1. E bene /A - F/Bedie nun g @ 11\ mod_ 127 918 554 164 9_1 5.doc x @ 8 304 3 @ 1 @ 1 Pos: 44 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Bedi enun g/Dim me r/Bedie nun g - 659 1 U-1 01 @ 23\ mo d_13 330 912 931 58_ 15.d ocx @ 207 069 @ @ 1...
  • Page 21: Configuration Through Pc Software

    Connected to PC During configuration, the lift control adaptor can be connected directly to the PC so that the installed software (ABB-Welcome PC Configuration Tool) can be used. Essentially, there is no need for local power supply during configuration. Upon completing configuration, click "Send the Configuration" to upload the configured file to the system.
  • Page 22: Configuration

    ABB-Welcome Configuration Basic Steps Step 1: Set basic param eters of the apartment using the ABB-W elcome configuration tool. Fig. 15 Function Select building number. Select floor number. Select apartment number. Set physical address (e.g., 13 means the IS address set by IS switches) Set user name Set logic address (e.g., 0703 means 7th floor, apartment number 3).
  • Page 23 ABB-Welcome Step 2: Select building, M2307 and configure param eters of each relay Fig. 16 Function Select building number Select M2307 number Click “Add” to add a new M2307 Select ON or OFF for connecting the relay Select NO or NC for output type...
  • Page 24 Select outdoor station number Select Relay No. of M2307 Click “Add” to associate outdoor station with relay Send all parameters to M2306 Input password*. Default password is 123456. *Please write down this password. If password is forgotten, software must be reloaded.
  • Page 25 Building number (same as step2) Select indoor station physical address Select relay number of M2307 Select outdoor station number (floor number of outdoor station installed) Click “Add” to associate indoor station with relay Send all parameters to M2306 Input password. Default password is 123456.
  • Page 26 ABB-Welcome Optional steps: Step 5: Export all data from this project or import data for new project Fig. 19 Function Export all lift control configuration data to one read-only Excel file. (Export the lift control configuration of each building for future reference.)
  • Page 27 ABB-Welcome Step 6: Save as one new project Fig. 20 Function Save as one new project: *.xml...
  • Page 28 ABB-Welcome Step 7: Import existing project data to new outdoor station, guard unit and lift control Fig. 21 Function Open one existing project: *.xml...
  • Page 29 W e reserve the right to, at any time, make technical changes or changes in the content of this document without prior notice. The detailed specifications agreed to at the time of ordering applies to all orders. ABB accepts no responsibility for possible errors or incompleteness in this document.

This manual is also suitable for:

M2307

Table of Contents