Commissioning the Appliance

Pilot Ignition Check
1. Ignite the pilot light as described in the User Instructions
2. Check that the pilot flame stays alight
3. Extinguish the pilot light
4. Ensure the glass is clean & fingerprints are removed prior to lighting as these could mark
the glass permanently.
Main Burner Check
1. Ignite the pilot light as described in the User Instructions
2. Turn on the main burner as described in the User Instructions
3. Check that the pilot smoothly cross-lights to the main burner and that the main burner
and pilot stay alight
4. Check the operation as described in the User Instructions
5. Extinguish the appliance fully
Pressure Check
The appliance is present to give the correct heat inputs as listed in the technical details. No
further adjustment is necessary. Always check the inlet pressure and burner pressure.
Pressure Regulator
Main Valve Knob
Side Inlet
Side Outlet
Inlet Pressure Tap
Outlet Pressure Tap
Bottom
Inlet
Bottom
Outlet
Pilot Gas Adjustment Screw
(turn with screw- driver)
Manual Knob
Connection Piezo
Igniter
Tab 2.8 x 0.8 mm
Magnet Unit
26