Commissioning Check List; Troubleshooting - ACR Electronics Tenbury T5500 Instruction Manual

Table of Contents

Advertisement

CURRENT June 2018 Tenbury T5500 install manual 1217-1.pdf
Ensure the serial number has been recorded on the front of this manual for any
future use
Ensure the door seals are in good condition and that the glass is secured correctly
in the door (do not over tighten the glass as this will prohibit its expansion and
could cause the glass to crack)
Ensure that all internal components are fitted correctly (these may have shifted in
transit)
Ensure that the appliance operates correctly during the first firing
Ensure the customer is aware that fumes may be given off during the first firings
as the paint cures
Advise the customer on the safe operation of the appliance
C
Leave the instruction manual, operating tool (if included) and glove for the
M
customer.
Y
Record the flue draught reading of the appliance
CM
MY
CY
CMY
K
Problem
Fire difficult to
start / goes out
Fire burns too quickly
Smokes on initial
lighting
Smokes while burning
Low heat output

Commissioning Check List

Please tick boxes when each procedure is completed

Troubleshooting

Probable Cause
• Green wood / wet wood
• Logs are too large
• Not enough primary air
• Insufficient draft
• Too much draft
• Excessive draft
• Flue is cold
• Insufficient draught
• Poor quality wood
12
08/04/2019
16:33:23
Action Recommend
Use hardwood logs with a maximum
moisture content of 20%
Use kindling and small logs to start the
fire and once established use split logs
Open air control
Check the flue is not obstructed
Reduce the air control
Install a draft stabiliser
Burn paper and kindling to increase
heat in flue
Check the flue is not obstructed
Use seasoned Hardwood (this has a
Higher calorific value)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tenbury t550mfTenbury t550da/eco

Table of Contents