Commissioning - LEGRAND MOSAIC Series Installation And User Manual

Nurse call unit
Hide thumbs Also See for MOSAIC Series:
Table of Contents

Advertisement

COMMISSIONING

Test MUST be performed with the power OFF whenever the installation is modified
CHECK BEFORE SWITCH-ON
Step 1: Unplug the connector
Step 2: Test circuit 1
Ø 1 2 3
Ø 1 2 3
2500
Ø 1 2 3
46
Ø 1 2 3
Ø 1 2 3
S
S
1
Ø 1 2 3
25 < Ω < 2500
25 < Ω < 2500
OFF
OFF
2k
2k
V/Ω
V/Ω
C M
C M
ON
ON
0 < Ω < 500
OFF
2k
V/Ω
C M
ON
0 < Ω < 500
Step 3: Test circuit 2
S
C
2
3
Ø 1 2 3
Ø 1 2 3
Ø 1 2 3
Ω =
Ω =
Ø 1 2 3
Ø 1 2 3
Ω =
Ø 1 2 3
Ø 1 2 3
Ø 1 2 3
S
S
1
2
Ø 1 2 3
25 < Ω < 2500
OFF
2k
25 < Ω < 2500
OFF
2k
V/Ω
C M
V/Ω
C M
ON
ON
OR
25 < Ω < 2500
OFF
2k
OFF
V/Ω
2k
C M
V/Ω
C M
ON
OR
25 < Ω < 2500
OFF
2k
V/Ω
OFF
C M
2k
V/Ω
C M
S
C
3
Ø 1 2
Ω =
Ø 1 2
Ω =
0 < Ω < 500
Ω =
Ø 1 2
Ω =
ON
0 < Ω < 500
Ω =
Ω =

Advertisement

Table of Contents
loading

Table of Contents