Hide thumbs Also See for Q-Tee II GAS:

Advertisement

Quick Links

Q - Te e I I G A S
Q - Te e I I C G A S
B R U G E R M A N U A L
B E D I E N U N G S A N L E I T U N G
U S E R M A N U A L
M A N U E L D ' U T I L I S AT E U R
B R U K E R V E I L E D N I N G
B R U K S A N V I S N I N G
K Ä Y T T Ö O H J E
G E B R U I K E R S H A N D L E I D I N G
POSITIV
1

Advertisement

Table of Contents
loading

Summary of Contents for RAIS/attika Q-Tee II GAS

  • Page 1 Q - Te e I I G A S Q - Te e I I C G A S B R U G E R M A N U A L B E D I E N U N G S A N L E I T U N G U S E R M A N U A L M A N U E L D ’...
  • Page 3: Revision

    Produced at: RAIS A/S, Industrivej 20, 9900 Frederikshavn, Danmark Product ID: 0359CS1717 Q-Tee II Gas Q-Tee II C Gas This appliance must be installed in accordance with the rules in force, and only used in a suffidebtly ventilated space. Consult instructions before installation and use of this appliance.
  • Page 4 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas This stove had been tested and certificated for several countries (see the rating plate). It may be necessary to adjust the stove for safe and correct use in your coun- try/area.
  • Page 5: Table Of Contents

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Revision : Date 20-06-2018 INTRODUCTION .........................6 GUARANTEE ...........................7 SPECIFICATIONS ........................8 DISTANCE/TEMPLATE ......................8 GENERAL GENERAL COMMENTS ......................9 EMERGENCY INTERRUPTION OF GAS SUPPLY ...............10 INSTALLATION OF STOVE INSTALLATION ........................11...
  • Page 6: Date : 20-06-2018

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Introduction attika Congratulation on your new RAIS / Product. attika A RAIS / stove is more than just a source of heat, it also expresses how you put the emphasis on good design and high quality in your home.
  • Page 7: Guarantee

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Guarantee attika RAIS/ stoves are checked several times with regard to safety, as well as the quality of materials and manufacturing. We offer a guarantee on all models and the guarantee commences on the date of installation.
  • Page 8: Specifications

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Specifications Intertek Ref.: 103435815LHD-001 Q-Tee II Gas Q-Tee II C Gas Nominal heat input (kW): Natural Gas - G20 I2H/I2E Min. input (kW): Natural Gas - G20 I2H/I2E...
  • Page 9: General General Comments

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas General General Comments attika This RAIS / product is an extremely effective convection gas stove with a sealed combustion chamber for chimneys with a balanced draught. It is fitted with a burner with the latest burner technology.
  • Page 10: Emergency Interruption Of Gas Supply

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Emergency interruption of gas supply Where a smell of gas is detected, the gas supply must be interrupted immediately. Turn off the stove at the isolation tap and the gas meter Ventilate the room by opening windows and doors, do not use electrical appliances in the vicinity of the stove.
  • Page 11: Installation Of Stove Installation

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas installation of stove Installation It is important that the stove is correctly installed from both an environ- mental and safety point of view. The stove must only be installed by a Gas Safe Registered engineer.
  • Page 12: Changing The Chimney Connection

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas PLEASE NOTE! The floor construction must be able to bear the weight of the stove and chimney, if applicable. If the existing design does not satisfy this prereq- uisite, suitable measures must be taken (e.g., a load distribution slab).
  • Page 13 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas 2. Loosen the three screws of the outer flange on the top sur- face of the stove. And remove it. 3. Loosen the three screws of the inner flange inside the burning chamber.
  • Page 14 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas 7. If the ceramic logs are fitted remove these. 8. Remove the Scamol fire bricks, (First remove the perforated plate) 9.The internal cover plate can now be dismounted.
  • Page 15: Conversion To Bottled Gas (Lpg)

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Conversion to bottled gas (LPG) IF the stove is supplied configured for natural gas, it can be converted to bottled gas (LPG). The conversion must only be carried out by a Gas Safe Registered engineer.
  • Page 16 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas The injector for the main burner for LPG is marked "80" The injector for the main burner for nat- ural gas is marked "120" The injector for the pilot light for LPG is marked "27"...
  • Page 17 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas The gas unit needs to be dismantled to gain access to the injectors. Do this in the following manner: Lift the perforated plate up and out of the stove.
  • Page 18 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Now the gas unit can be lifted out carefully by tilting and rotating the unit a little. Once the gas unit has been dismounted, replace the four injectors and adjust the three air intakes.
  • Page 19 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Remove the injector for the main burner by loosening the coupling and carefully pulling the pipe out and then unscrewing the injec- tor. Fit the LPG injector and tighten the lock nut.
  • Page 20 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas The air intake to the main burner is adjust- ed for LPG configuration by loosening the two nuts and pushing the plate all the way towards the burner.
  • Page 21 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas The air intakes need to be reversed therefore when the stove is config- ured for LPG. The gas unit is reassembled using the four screws. Replace the perforated plate and fully assemble the stove.
  • Page 22: Normal Installation - Q-Tee Ii Gas

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Installation distance from flammable wall In order to clarify whether the wall your stove will stand alongside is flammable, you can contact your building architect or the local building authorities.
  • Page 23: Normal Installation - Q-Tee Ii C Gas

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Q-Tee II C Gas Normal installation - at right angle A. Furniture distance (min.) 700 mm Distance to flammable material (min.) D. rear (wall) 50 mm E.
  • Page 24: Corner Installation 45° - Q-Tee Ii Gas

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Corner installation 45° Q-Tee II Gas A. Furniture distance (min.) 700 mm Distance to flammable material (min.) D 50 D. rear (wall) 50 mm D 50...
  • Page 25: Corner Installation 45°- Q-Tee Ii C Gas

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Corner installation 45° Q-Tee II C Gas A. Furniture distance (min.) 700 mm Distance to flammable material (min.) D. rear (wall) 50 mm D 50...
  • Page 26: Installation Spacing For Non-Flammable Wall

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Installation distance at non-flammable wall We recommend a minimum distance of 75mm (F) to non-flammable material to allow service and installation. Where the outlet is to the rear, there should however be space for a measuring connection piece for combustion control.
  • Page 27: Chimney/Flue

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Chimney/Flue This stove must be either installed with a vertical terminal (C31) or a horizontal terminal (C11) Must only be installed with a flue with a balanced draught (also known as a concentric draft) as stated by RAIS.
  • Page 28: Location Of Chimney Terminals

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Location of chimney terminals Distance (mm) Dimension Terminal Position Directly under an opening, an open window or ventilation duct Above an opening, an open window or ventilation duct Alongside an opening, opening window etc.
  • Page 29: Horizontal Wall Terminal Type C11

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Horizontal Wall Terminal type C11 Dimension of outflow pipe: Ø100 / Ø150 Outlet connection piece on the stove Ø100 / Ø150 Can be used for the entire chimney, or, Ø130 / Ø200 Adapter can be used so that you can use...
  • Page 30: Vertical Roof Terminal C31

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Vertical roof terminal type C31 Dimension of outflow pipe: Ø100 / Ø150 Outlet connection piece on the stove Ø100 / Ø150 Can be used for the entire chimney, or, Ø130 / Ø200 Adapter can be used so that you can use...
  • Page 31: Fitting Of Secondary Burner

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Fitting of Secondary burners The burners are inserted above the pipes sticking through the perforated plate. Note that there is a right burner and a left one so it is important that they are posi- tioned as shown, i.e., that the...
  • Page 32: Arrangement Of "Embers" And "Logs

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Arrangement of "Embers" and ”Logs" When layers of embers and the ceramic logs are arranged in the com- bustion chamber, it is important that the pilot flame and its thermosen- sor are not covered over.
  • Page 33 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas ceramic "Logs Log 1 Log 2 Log 3 Log 4 Log 6 Log A Log 5 Log B...
  • Page 34 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Positioning of Logs and Embers Spread the content of the bag of "Embers" as shown in the illustra- tion. Note: The pilot area must be kept clear of "Embers".
  • Page 35 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Log 3 Log 4 Log 5...
  • Page 36 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Log 6 Sample photos Log A Log B...
  • Page 37: Start-Up

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Start-up Insertion of Batteries. The receiver on the stove and the remote con- trol use batteries. A set of batteries to be inserted prior to start- up is included.
  • Page 38 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas The batteries in the receiver must face the directions shown in the illustration. The remote control uses 2 x AA 1.5 V batteries.
  • Page 39: Setting Up The Electronic Code

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas SETTING UP OF THE ELECTRONIC CODE In order for the remote control to work, it must be synchronised with the stove's receiver. A code is selected automatically and at random from 65,000 possible codes.
  • Page 40: Commissioning

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Commissioning Check functioning of pilot light. See User Instructions for use of remote control. 1. Start the pilot light. 2. Check that the pilot light remains ignited.
  • Page 41 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas The gas type is checked on the Manufacturer’s plate on the oven, either Natural, City gas or Propane.
  • Page 42: Initial Ignition

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Initial ignition Before the initial ignition, ensure that all packaging, labels etc. have been removed from the stove and that the door glass has been cleaned.
  • Page 43: User Instructions

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas User instructions USER INSTRUCTIONS NOTE: When you press on a deactivated button, GENERAL NOTES nothing happens and two horizontal lines are dis- played. The wiring for valves and receiver must be closed off before...
  • Page 44 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Signal control Child proofing Time Thermostatic mode Battery status Countdown timer Fahrenheit or Celsius Program mode Eco mode Temperature Help function SETTING OF FAHRENHEIT or CELSIUS CHILD PROOFING Change between °C and °F...
  • Page 45 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas HOW TO IGNITE IN STANDBY MODE (PILOT LIGHT) HANDSET •Press and hold down the button to set the appli- When pilot ignition is confirmed, the motor auto- ance to pilot light.
  • Page 46 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas •High flame is activated Program mode by double-clicking on the button HI is displayed. PROGRAMS 1 and 2 can both be programmed to start or stop at specific times at a set temperature.
  • Page 47 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas PROGRAM MODE SETTING THE DAY: 1 or 2, 5. ALL flashes. Press the Press the button ON or OFF is displayed. button to select from ALL, SA:SU, 1, 2, 3, 4, 5, 6, 7.
  • Page 48 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas SA:SU or Daily Timer ( 1 , 2, 3, 4, 5, 6, 7) is select- • Set operating time and time for shut down by using the same approach as during "ALL selected"...
  • Page 49: Using Stove Without Remote Control

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas...
  • Page 50 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas...
  • Page 51: Service

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Service. The stove should be inspected by a Gas Safe Registered engineer once a year. As a minimum, this inspection should ensure that the stove is working correctly and is safe to use.
  • Page 52: Cleaning

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Cleaning It is advisable to clean the stove of dust and foreign bodies each new heating season and especially if the stove has not been used for a long time. This can be done with a soft brush and a vacuum cleaner.
  • Page 53: Accessories

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Accessories 3713506 - Mains Adapter (Connecting the stove to a network) 3713507 - MyFire Wi-Fi Box incl. cable (App-based control of the stove) 3713595 - Propane Gas LP Conversion kit...
  • Page 54: Myfire Wi-Fi Box

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Installation of MyFire Wi-Fi Box The stove can be controlled remotely via an APP for your smart phone or tablet. The MyFire Wi-Fi Box is connected to the Receiver, which is placed under the combustion chamber and inserting the narrow plug on the Wi-Fi lead into the opening marked ”SI”.
  • Page 55 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas CONFIGURATION OF THE MYFIRE APP CONFIRM THE SETTINGS FOR THE FIREPLACE When configuring the MyFire app you will need the After confirming the settings for fireplace, touch SSID key and access code for the wireless network the "Finish"...
  • Page 56: Spare Part List

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Spare parts list: Q-Tee II Gas If spare parts other than those recommended by RAIS are used, the guarantee will be invalidated. All replaceable parts can be purchased as spare parts from your RAIS dealer.
  • Page 57: Spare Part List Gas Unit

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Spare parts list: Gas unit If spare parts other than those recommended by RAIS are used, the guarantee will be invalidated. All replaceable parts can be purchased as spare parts from your RAIS dealer.
  • Page 58: Technical Information

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Technical Information Country Natural AT -Austria I2H, G20 at 20 mbar I3P(50),G31 at 50 mbar; I3B/ P(50),G30/G31 at 50 mbar BE -Belgium I2E+, G20/G25 at 20/25 I3+,G31/G31 at 28/37 mbar;...
  • Page 59 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Country Natural GR -Greece I2H, G20 at 20 mbar I3+,G31/G31 at 28/37 mbar; I3P(37),G31 at 37 mbar; I3B/ P(30),G30/G31 at 30 mbar HU-Hungary I3B/P(30),G30/G31 at 30 mbar...
  • Page 60: Technical Data

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Technical Data Product Identification Number: 0359CS1717 Gas type G20/G25 G25/G25.3 G20/G25 I2H,I2E I2E+ I2L/ I2EK I2ELL (natural gas - LNG) Supply Pressure mbar 20/25 Nominal Heat Input 9.1 / 8.4...
  • Page 61 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Gas type G30/G31 G30/G31 I3B/P(30) I3P(50) I3P(37) I3P(30) (liquid petroleum gas - LPG) Supply Pressure mbar 30 / 37 Nominal Heat Input Gross (Hs) Nominal Heat...
  • Page 62: Examples Of Chimney Solutions

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas EXAMPLES OF CHIMNEY SOLUTIONS Vertical Roof Terminal Distance ”V” 500mm - 12m (min. - Max)
  • Page 63 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Vertical Roof Terminal (Renovation kit) (PT 3 of 3) (Flexible flue insert Ø100 AI- SA-316Ti) Existing chimney (PT 2 of 3) (PT 1 of 3)
  • Page 64 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Vertical Pitched Roof Terminal 18,19 1,2,3,6 11,12,13 1,2,3,6 Distance ”H” = 0-3m (Min - Max) Distance ”V1” = 500mm - 10m (Min - Max) Distance ”V2” = 200mm - 10m (Min - Max) Distance ”V3”...
  • Page 65 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Vertical Roof Terminal with Bend Distance ”H” = 0-3m (Min - Max) Distance ”V1” = 500mm - 10m (Min - Max) Distance ”V2” = 500mm - 10m (Min - Max) Distance ”V”...
  • Page 66 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Existing chimney (Renovations kit) (PT 3 of 3) (Flexible flue insert) Ø100 AISA-316Ti) Existing chimney * (PT 2 of 3) (PT 1 of 3) 1,2,3,6 Distance ”V”...
  • Page 67 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Existing chimney with Bend (Renovations kit) (PT 3 of 3) (Flexible flue insert Ø100 AISA-316Ti) Existing chim- ney * (PT 2 of 3) (PT 1 of 3)
  • Page 68 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Vertical Roof Terminal with Back outlet for more information see paragraph Location of chimney terminals...
  • Page 69 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Horizontal wall Terminal for more information see paragraph Location of chimney terminals...
  • Page 70 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Horizontal wall Terminal for more information see paragraph Location of chimney terminals Top outlet Back outlet Snorkel Snorkel...
  • Page 71: Chimney Components

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas Chimney components. US 100 100 (Ø100) US 100 130 (Ø130) Length 1000mm US 25 100 (Ø100) US 25 130 (Ø130) Length 250mm US 50 100 (Ø100) US 50 130 (Ø130)
  • Page 72 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas USDV2 100 (Ø100) Vertical Terminal (+ USKB) USPP 100 (Ø100) USPP 130 (Ø130) Adjustable length USDHCE 10 Horizontal Terminal (Eccentric outlet) USMB 100 (Ø100) USMB 130 (Ø130) Adjustable Wall Strap USEB 100 (Ø100)
  • Page 73 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas USB 90 100 (Ø100) USSR 100 (Ø100) USB 90 130 (Ø130) USSR 130 (Ø130) 90° elbow bend Cover USDPAL 100 (Ø100) USDPAL 130 (Ø130) USB 45 100 (Ø100) Flat roof Cover USB 45 130 (Ø130)
  • Page 74 English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas USDH 100 (Ø100) USMPG 100 (Ø100) USDH 130 (Ø130) USMPG 130 (Ø130) Angular Cover Wall Cover 5° - 30° USLS 100 (Ø100) USLS 130 (Ø130) Angular Cover 20°...
  • Page 75: Declaration Of Performance

    English RAIS/ - User manual for Q-Tee II Gas / Q-Tee II C Gas DECLARATION OF PERFORMANCE Regulation (EU) 2009/142/EC No.: 12 Q-Tee II Gas, Q-Tee II C Gas 1. Unique identification code of the product-type 2. Type Balanced Flue Gas Stoves 3.
  • Page 76 Français...
  • Page 77 Q-Tee II Gas E 250 D 50...
  • Page 78 Q-Tee II Gas - Low Socket D M Y Corre Change order Drawing change: TILLADTE AFVIGELSER FOR LINIEÆRE MÅL INDUSTRIVEJ 20, 9900 F 0.5-3 30-120 6-30 120-400 400-1000 1000-2000 Phone +45 98 47 90 E-mail: info@rais.dk TILLADTE AFVIGELSER FOR VINKELMÅL...
  • Page 79 Q-Tee II Gas - High Socket D M Y Change orde Drawing change TILLADTE AFVIGELSER FOR LINIEÆRE MÅL INDUSTRIVEJ 20, 9 0.5-3 6-30 30-120 1000-2000 120-400 400-1000 Phone +45 98 E-mail: info@ra TILLADTE AFVIGELSER FOR VINKELMÅL 0-10 Drawing name: 10-50...
  • Page 80 Q-Tee II Gas - Low Legs D M Y Change Drawing ch TILLADTE AFVIGELSER FOR LINIEÆRE MÅL INDUSTRIVE 0.5-3 6-30 30-120 1000-2000 120-400 400-1000 Phone + E-mail: TILLADTE AFVIGELSER FOR VINKELMÅL Drawing nam 0-10 10-50 50-120 120-400 > 400 KORTESTE SIDE 1°...
  • Page 81 Q-Tee II Gas - High Legs D M Y Corr Change order Drawing change: TILLADTE AFVIGELSER FOR LINIEÆRE MÅL INDUSTRIVEJ 20, 9900 0.5-3 30-120 6-30 120-400 400-1000 1000-2000 Phone +45 98 47 90 E-mail: info@rais.dk TILLADTE AFVIGELSER FOR VINKELMÅL Drawing name:...
  • Page 83 Q-Tee II C Gas E 250 D 50...
  • Page 84 Q-Tee II C Gas - Low Socket D M Y Corrections: Change order Drawing change: Improvem TILLADTE AFVIGELSER FOR LINIEÆRE MÅL INDUSTRIVEJ 20, 9900 FREDERIKSHA 0.5-3 30-120 6-30 120-400 400-1000 1000-2000 Phone +45 98 47 90 33 - Fax +45 9 E-mail: info@rais.dk - Homepage: w TILLADTE AFVIGELSER FOR VINKELMÅL Q-Tee II C G...
  • Page 85 Q-Tee II C Gas - High Socket D M Y Corrections: Change order Drawing change: Improvement p TILLADTE AFVIGELSER FOR LINIEÆRE MÅL INDUSTRIVEJ 20, 9900 FREDERIKSHAVN, D 0.5-3 30-120 6-30 120-400 400-1000 1000-2000 Phone +45 98 47 90 33 - Fax +45 98 47 E-mail: info@rais.dk - Homepage: www.r TILLADTE AFVIGELSER FOR VINKELMÅL Q-Tee II C Glas...
  • Page 86 Q-Tee II C Gas - Low Legs D M Y Corrections: Change order Drawing change: Improvement pr TILLADTE AFVIGELSER FOR LINIEÆRE MÅL INDUSTRIVEJ 20, 9900 FREDERIKSHAVN, DE 0.5-3 30-120 6-30 120-400 400-1000 1000-2000 Phone +45 98 47 90 33 - Fax +45 98 47 92 E-mail: info@rais.dk - Homepage: www.rais TILLADTE AFVIGELSER FOR VINKELMÅL Q-Tee II C Glass...
  • Page 87 Q-Tee II C Gas - High Legs D M Y Corrections: Change order Drawing change: Improvement pr TILLADTE AFVIGELSER FOR LINIEÆRE MÅL INDUSTRIVEJ 20, 9900 FREDERIKSHAVN, DE 0.5-3 30-120 6-30 120-400 400-1000 1000-2000 Phone +45 98 47 90 33 - Fax +45 98 47 92 E-mail: info@rais.dk - Homepage: www.rais TILLADTE AFVIGELSER FOR VINKELMÅL 0-10...
  • Page 88 Q-Tee II Gas - Spareparts TILLADTE AFVIGELSER FOR LINIEÆRE MÅL 0.5-3 6-30 30-120 120-400 400-1000 1000- TILLADTE AFVIGELSER FOR VINKELMÅL 0-10 10-50 120-400 50-120 > 40 KORTESTE SIDE 1° 0-30° 0-20° 0-10° VINKELAFVIGELSE AFVIGELSE I MM pr. 100 mm...
  • Page 89 Q-Tee II C Gas - Spareparts TILLADTE AFVIGELSER FOR LINIEÆRE MÅL 0.5-3 6-30 30-120 120-400 400-100 TILLADTE AFVIGELSER FOR VINKELMÅL 0-10 10-50 50-120 120-40 KORTESTE SIDE 1° 0-30° 0-20° 0-10° VINKELAFVIGELSE AFVIGELSE I MM pr. 100 mm...
  • Page 90 ATTIKA FEUER AG Brunnmatt 16 CH-6330 Cham Switzerland www.attika.ch RAIS A/S Industrivej 20 DK-9900 Frederikshavn Denmark www.rais.dk...

This manual is also suitable for:

Q-tee ii c gas

Table of Contents