Jack Stands / Outriggers; Tie Down/ Brake/ Chock; Rope Payout Procedure (Free Wheel) - HOGG & DAVIS ODP 20-4 Manual

2,000 lb. four drum puller
Table of Contents

Advertisement

ODP 20-4
2,000 Lb. Four Drum Puller

Jack Stands / Outriggers

Actuate the rear outriggers to stabilize the trailer. Attempt to
level the trailer as much as possible. The outriggers have the
ability to raise the tires from the ground, but as a rule they
should be used to stabilize the load across all contact points on
the ground, i.e. Jack stands, tires, front tongue jack stand.

Tie Down/ Brake/ Chock

Chock all wheels and set brakes (if applicable). It should be
noted that a fully loaded trailer may exceed the tension
desired during the pull. As the pull progresses, the weight of the
trailer may increase or decrease, therefore proper securing
procedures should be followed during operation. This unit is
equipped with tie – down eyes for staking to the ground and it
is recommended that the unit stay secured to the tow vehicle
whenever possible.

Rope Payout Procedure (Free Wheel)

When beginning the rope payout feature, be sure that the engine is
turned off.
Ensure that all tension is removed from the pulling rope before attempting
to remove drive pin.
Adjust reel brake to provide tension to the reel of rope.
Disengage the drive pin from reel to be free wheeled. Begin to
pull rope through the blocks while continuing to adjust the over
spin brake. When the rope install is completed, re-apply over
spin brake to maximum pressure. Rotation of the rope reel shaft
may be needed to properly install drive pin. With engine at idle
slowly operate in take-up mode to engage the drive pin of reel
to be pulled.
© COPYRIGHT 2016 HOGG & DAVIS, INC
- - 8 - -

Advertisement

Table of Contents
loading

Table of Contents