Setup On The Job; Setup Of The Unit; Position Of Unit - HOGG & DAVIS ODP 20-4 Manual

2,000 lb. four drum puller
Table of Contents

Advertisement

2,000 Lb. Four Drum Puller
Operating Instructions
All persons operating this machine must read and understand
this manual as well as the operating, danger, and warning
decals placed on the machine. Failure to read and
understand these items subjects the operator and others to
DEATH or SERIOUS INJURY.
Operators shall make themselves familiar with the placement of
the following operating and safety features of the machine.
 Grounding Lugs and their placement on Machine (1)
 Drive Chains and Sprockets (2)
 Take Up / Pay-Out / Control (3)
 Engine Controls and Gauges (4)
 Lubrication Points (various)
 Level wind Bearing and Pins (5)
 Tie Down Locations (6)
 Manual Jack stands (standard)
 Hydraulic Jack stands (optional)

Setup on the Job

Setup of the unit

Position of unit

Position the trailer with the centerline
of the trailers in line with the pull.
Place the unit at a minimum of two
times the height of the first block.
ODP 20-4
© COPYRIGHT 2016 HOGG & DAVIS, INC
- - 7 - -

Advertisement

Table of Contents
loading

Table of Contents