4.3 Testing

Tests are to be done according to EN 60079-19 until returning the repaired unit back to
operation. Below mentioned tests shall be done in addition to the tests specified in EN 60079-
19:
· PE –resistance test
· High-voltage test (500 VDC between Phase& Neutral against P/E conductor)
· Operational test (e.g. wiring of sockets)
· Test of expected use (vibrations, shaking)
Proper testing ensures safe operation of repaired equipment.

4.4 Repair report

The operator is responsible for keeping up to date record of the condition of his equipment
(EN 60079-14). Ensuring the availability of this important information each repair procedure
should be written down in repair report according to EN 60079-19.
This report should reveal at least:
· Person who conducted the maintenance
· Date of maintenance
· Procedure of maintenance
· Signature of person responsible accepting the maintenance
More information about the use of Electrical Apparatus for Explosive Gas Atmospheres is
available at:
EN 60079-14 (Electrical installations in hazardous areas)
EN 60079-10 (Classification of hazardous areas)
EN 60079-17 (Inspection and maintenance of electrical installations in hazardous areas)
IEC 60079-19 (Repair and overhaul for apparatus used in potentially explosive atmospheres)