Brine Nebulization System, Type Soldos V3
9.5
The maintenance protocol is included in the documents attached.
ATTENTION: !
Disinfection is required at each polyethylene container change and
at least every 28 days!
Maintenance of brine rooms
We recommend rinsing the inside area of steam baths at the end of the operation
with water, so that no salt deposits or crusts can form.
Index: 03
Change date: 01/03/2017
Maintenance protocol
Operating instructions no.: BA DW 005-03 Soldos V3 EN.docx
Page 66 of 70