Brine Nebulization System, Type Soldos V3
and the nozzle part is slid into the wall feed-through and fastened to the wall with
the 2 screws provided.
We recommend to install the dosing lines within special protective material
(insulation). (Pressure shocks of the membrane pump.) Ensure that the dosing line
is freely moveable towards the rear so that the nozzle can be removed when
required (at least 10 cm).
Installing the button (optional)
A flush-mounted cover is recommended for installing the button. The button and
the flush-mounted cover can be ordered as optional accessories. During the
installation the cover is fixed against the wall and sealed against the lining of the
room. An empty conduit with 25 mm inside diameter should be selected when an
empty conduit for the button cable is to be installed. Care must be taken during
the installation that the conduit does not fall short of a 30 cm minimum bending
radius. The plug-in-ready button cable must only be pulled in and connected.
The dimensions for buttons and UP covers are provided below:
The button plate is connected to the flush-mounted cover / wall with 4 screws. See
figure
ATTENTION !
The button plate must be sealed against the room wall with suitable
sealing material to prevent humidity from penetrating behind the
button plate!
4.4
Install the dosing line by starting at the nozzle part of the Brine Nebulization station
and then connecting it to the hose connection (12).
Index: 03
Change date: 01/03/2017

Hydraulic installation

Operating instructions no.: BA DW 005-03 Soldos V3 EN.docx
Page 15 of 70

Advertisement

Table of Contents
loading

Related Products for WDT Soldos V3

Table of Contents