Mechanical Installation - WDT Soldos V3 Operating And Installation Instructions

Brine nebulization system
Table of Contents

Advertisement

Brine Nebulization System, Type Soldos V3
4.3
Installing the brine dosing nozzle
The nozzle must be mounted on a higher level than the nebulization station with
the brine container in order to prevent the brine container from running empty!
A non-return valve must be installed in the dosing line when this is not possible.
A hole of approx. 40mm must be drilled through the cabin wall (see Figure) for
the installation of the nozzle part and the wall feed-through. The hole should have
a distance of 20-30cm to the cabin ceiling. The hole should be as far as possible
from the exhaust port. The best place is directly over the steam inlet opening. The
wall feed-through is included in the delivery scope and is glued into the hole in a
diffusion tight manner.
Nozzle part
Figure6, Installation of nozzle part and wall feed-through
The nozzle part consist of a nozzle cover with nebuliser nozzle and hose
connection and is delivered as an assembled unit.
The dosing line is made of PTFE 4x1mm, is ducted from the outside of the room
through the wall feed-through and connected to the hose connector of the nozzle
part. The O-rings of the nozzle part are lightly greased with the grease supplied
Index: 03
Change date: 01/03/2017

Mechanical installation

Nebulizer nozzle
Operating instructions no.: BA DW 005-03 Soldos V3 EN.docx
Wall feed-through
Page 14 of 70