Assembly; Selecting The Place Of Installation; Assembly Information (Installation Suggestion) - WDT Soldos V3 Operating And Installation Instructions

Brine nebulization system
Table of Contents

Advertisement

Brine Nebulization System, Type Soldos V3
4

Assembly

4.1
The place of installation must have the following characteristics:
1. The system must be protected against direct sunlight.
2. An electrical power connection with ground contact must be available.
3. Good air supply and extraction are recommended for the installation room.
4.2
The Soldos V3 is mounted on a wall in the utility room. Consider the space required
for operation and maintenance of the device.
ATTENTION :
The Soldos V3 is not intended for installation in the open!
The following work must be performed before starting the installation:
 Warning and information signs according to the locally applicable accident
prevention regulations (Germany: GUV-V D05) must be attached at the
positions prescribed.
 All materials must be tested in a steam bath and the ventilation pipes for
corrosion resistance against a 5% brine solution before installing a SOLDOS
unit!
 Only highly purified, disinfected WDT brine with max. 5% salt content should
be used!
Index: 03
Change date: 01/03/2017

Selecting the place of installation

Assembly information (installation suggestion)

Operating instructions no.: BA DW 005-03 Soldos V3 EN.docx
Page 12 of 70

Advertisement

Table of Contents
loading

Related Products for WDT Soldos V3

Table of Contents