Maintenance; Daily Maintenance - Nordson AZO E360 Customer Product Manual

Rotary sieve + hopper
Table of Contents

Advertisement

20

Maintenance

Daily Maintenance

Component
Cables,
Tubing,
and
Feed Hoses
HDLV Transfer Pumps
Powder Supply
Compressed Air Supply
Enclosure
Venting
Hopper
Part 7580607_01
WARNING: Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
NOTE: Maintenance procedures given here are for the general assembly
only. Refer to your system component manuals for maintenance procedures
for all other system equipment. For all maintenance requirements of the
rotary sieve, please refer to the AZO E360B technical manual; this can be
supplied by Nordson upon request.
Note:
You may need to perform these procedures more or less often,
depending on your application requirements.
Check all external cables, powder
replace as necessary
Purge the pumps. Inspect the pinch valve body for signs of powder leakage. If
powder is present in the pinch valve section, replace the pinch
the Prodigy HDLV High- Capacity pump manual for repair procedures
Check the powder supply level regularly and add powder as necessary
Check the compressed air dryers and filters. Drain filters if needed. Perform
maintenance as necessary
Clean the interior and exterior of the Rotary Sieve Assembly. Check all
equipment ground connections
Check and clean sieve and hopper venting hoses
Check hopper fluidisation is correct. Gently simmering evenly.
Maintenance Procedure
hoses,
and air tubing for
damage.
Repair or
valves.
Refer to
E 2018 Nordson Corporation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Azo e650

Table of Contents