Download Print this page

Installation Instructions - GE RAK4002C Installation Instructions Manual

Junction box kit for az45/az65 series zoneline

Advertisement

Available languages

Available languages

ZONELINE SERIES – DIRECT ELECTRICAL CONNECTION
1. REMOVE ROOM FRONT
Remove the room cabinet by pulling it out at the bottom to
release it (1); then lift it up to clear the rail along the unit top
(2).
2. REMOVE JUNCTION BOX
KNOCKOUT
For conduit installation: Use the round hole in the
bottom of the junction box base.
For sub-base/chaseway installation: Remove
rectangular knockout from junction box base.
Mount wire
retaining
clip through
this hole
Round
Conduit
Knockout
Rectangular
Chaseway
Knockout
3. INSTALL JUNCTION BOX
Install the junction box by inserting the left tabs into
control box cover slots, and aligning two screw holes
inside the upper and lower enclosure.
Slots on
Control
Box Cover

Installation Instructions

Tabs on
Junction
Box
2
3. INSTALL JUNCTION BOX
(continued)
Drive the two screws until they are secure.
4. CONNECT THE POWER SUPPLY
KIT
Plug the power connectors, ensuring plug is fully seated
and locking tabs are engaged.
15A
For 20 AMP and 30 AMP power supply kits, a
second smaller plug must also be plugged into its
corresponding mating connector.
For a direct connect kit installation with a conduit,
proceed to step 5A.
For a direct connect kit installation with a sub-base
and chaseway, skip ahead to step 5B.
Screws
20A and 30A

Advertisement

loading