Before you begin - Read these instructions completely and carefully.
IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES.
Note to Installer – Be sure to leave these instructions with the Consumer.
Note to Consumer – Keep these instructions with your Owner's Manual for future reference.
Tools Needed
• Phillips screwdriver
Important Notes
• This unit must be properly grounded.
• Connections are made inside this junction box
assembly.
• This kit provides for connection of 1/2" trade
size electrical conduit and connection to a
wiring system in accordance with the National
Electric Code. ANSI/NFPA No. 70-2014.
It also provides for use with optional sub-
base and chaseway RAK204U/RAK205CW,
RAK204D15*, RAK204D20*, RAK204D30*,
RAK204E15, RAK204E20 and RAK204E30.
* All Series
Parts Included
• Junction box assembly
• Mounting screws (4)
• Wire retaining clip
Installation Instructions
for your new
RAK4002C
Junction Box Kit
For AZ45/AZ65 Series Zoneline
WARNING:
Disconnect the electrical power supply before wiring
connections.
INSTALLATION NOTES
Reference Installation Instructions in the Zoneline
Owner's Manual.
A. Branch Circuit Connection
230/208 volt
To connect branch circuit to unit using direct
wiring, use properly rated wire nuts and
enclose fully within junction box.
B. For use with sub-base and chaseway
Branch circuit wires can be run from the sub-
base, up the chaseway and into the junction
box where connections are made. Electrical
connections can be made directly to the
branch circuit with properly rated wire nuts or
by plug through receptacle of appropriate sub-
base. See additional Installation Instructions
with the sub-base kit.
Power supply kits or unit cords can be run from
the junction box, down the chaseway and into
the sub-base.
RISK OF ELECTRIC SHOCK.
31-30778-3 08-16 GEA
Need help?
Do you have a question about the RAK4002C and is the answer not in the manual?
Questions and answers