Download Print this page

Wolf MGK-130 Instructions Manual page 13

Gas condensing boilers. conversion to lpg p (g31)

Advertisement

3. Changing the boiler coding card
a) Where appropriate, record the parameter changes
compared to their factory settings
(e.g. output, Tvmax, output 1, input 1, address
setting).
b) Isolate the appliance from the power supply.
c) Pivot out the control unit.
d) Open the boiler coding card cover.
e) Pull off the boiler coding card and plug in the new
one.
f) Refit the boiler coding card cover.
4. Function check
a) After commissioning, the multi-function indicator on
the ON/OFF switch begins to flash. Press the reset
button twice.
b) The burner starts.
c) Function check: Close the gas tap.
Fault code 12 or indicator ring flashes red.
d) Open gas tap, press reset button.
The burner starts.
e) Adjust parameters if changes from the factory
settings are required.
f) Check the function of control accessories.
3062883_0910
Conversion to G20, G25 or G31
Boiler coding card cover
Boiler coding card
13

Advertisement

loading