Miscellaneous; Date/Time; Baseline Monitoring; Temperatures And Cooling - Siemens PGC 302 Edition II Manual

Process gas chromatograph
Table of Contents

Advertisement

Miscellaneous

Date/time

The clock has a battery backup in chromatographs
fitted with a
PCPU-1
Chromatographs with a
backup battery. Following a power failure, the
clock is set to 1.1.1980, 0:00 hours.
From software version V7.0 onwards (operation and
control software!) the clock in the chromatograph
can be synchronized with the clock in the control
unit. This must be selected during installation. The
time of the control unit is then sent to all connected
chromatographs approx. once a minute.

Baseline monitoring

The baseline of the FID can be monitored. An
alarm is output if the FID flame is extinguished in
process operation. The chromatograph becomes Not
ready, and never Ready again; process operation is
blocked! The only remedy is to reset the chromato-
graph.
Cause: the baseline monitoring function only oper-
ates whilst a run was being carried out. From con-
trol software version V6.0 onwards, the baseline
alarm is reset when the FID is ignited.
Detailed information on the baseline monitoring func-
tion can be found in Register 5 under Baseline monitor-
ing.

Temperatures and cooling

Only those controllers are now listed in the display
Temperatures which are fitted.
Cooling with cryostat, N
the display Temperatures.

Analytical method

The header displays the name of the method which
is loaded in the chromatograph.

Analog inputs and outputs

The display Software version additionally indicates
how many analog inputs and outputs are present in
the chromatograph.
26
.
no longer have a
PCPU-2
or CO
can be adjusted in
2
2
Miscellaneous
5DIVERSE.CHP, Stand Dezember 22, 1999

Advertisement

Table of Contents
loading

Table of Contents