Krom Schroder TC 410 Operating Instructions Manual

Krom Schroder TC 410 Operating Instructions Manual

Tightness control

Advertisement

449500
D
GB
F
NL
I
TR
CZ
PL
RUS
H
 
Operating instructions
Contents
Contents
Tightness control TC 40. . . . . . . . . . . . . . . . . 
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
Checking The Usage . . . . . . . . . . . . . . . . . . . . . 
Type Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Part Designations . . . . . . . . . . . . . . . . . . . . . . . . 2
Type Label. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 
Setting The Test Instant . . . . . . . . . . . . . . . . . . 
Setting the test period t
Values For Valve And Pipe Volume . . . . . . . . . . . . 3
Commissioning. . . . . . . . . . . . . . . . . . . . . . . . . 4
Power Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Technical Data . . . . . . . . . . . . . . . . . . . . . . . . . 5
Designed Lifetime . . . . . . . . . . . . . . . . . . . . . . . . 5
Logistics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Certification . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Contact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
E
DK
S
N
P
GR
www.docuthek.com
. . . . . . . . . . . . . . . . 
P

Safety

Safety
Please read and keep in a safe place
Please read through these instructions
carefully before installing or operating. Following the
installation, pass the instructions on to the opera-
tor. This unit must be installed and commissioned
in accordance with the regulations and standards
in force. These instructions can also be found at
www.docuthek.com.
Explanation of symbols
• ,  ,  ,  ... = Action
= Instruction
Liability
We will not be held liable for damage resulting from
non-observance of the instructions and non-com-
pliant use.
Safety instructions
Information that is relevant for safety is indicated in
the instructions as follows:
DANGER
Indicates potentially fatal situations.
WARNING
Indicates possible danger to life and limb.
CAUTION
Indicates possible material damage.
All interventions may only be carried out by qualified
gas technicians. Electrical interventions may only be
carried out by qualified electricians.
Conversion, spare parts
All technical changes are prohibited. Only use OEM
spare parts.
Changes to edition 04.7
The following chapters have been changed:
Technical data
Certification
GB-1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TC 410 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Krom Schroder TC 410

  • Page 1 Safety Safety 449500 Please read and keep in a safe place www.docuthek.com   Please read through these instructions Operating instructions carefully before installing or operating. Following the Tightness control TC 40 installation, pass the instructions on to the opera- tor. This unit must be installed and commissioned in accordance with the regulations and standards in force.
  • Page 2: Tightness Control Tc

    TEST OK see type label. D-49018 Osnabrück, Germany ▷ On VG 15 – 40/32, the test point is connected TC 410 to the valve inlet. Imax 5A IP40 CE 0085AP0020 8 Set the pressure switch to half the inlet pres- sure p...
  • Page 3: Values For Valve And Pipe Volume

    ϑ L1(+) ▷ The switching differential of the pressure switch N(-) may not exceed ±10% of the set value. Example: "TEST " :" TEST" inlet pressure p = 100 mbar, set switching pressure p /2 = 50 mbar, max. switching differential 50 mbar x 10% = 5 mbar.
  • Page 4: Commissioning

    Valve Nominal Pipe Commissioning Valves volume size volume ▷ Indicators and operating controls: [l/m] VK 125 13.6 12.3 VK 150 17.7 VK 200 31.4 VK 250 TEST VAS 1 0.08 = TEST phase (yellow) VAS 2 0.32 TEST VAS 3 0.68 = operating signal (green) VAS 6...
  • Page 5: Maintenance

    ! Wiring to the valves reversed. Set at the factory to 10 s. • Start the program and observe the interspace TC 410-10: 100 to 600 s, adjustable. Set at the pressure p . The pressure must change during factory to 100 s.
  • Page 6: Logistics

    FM approved Logistics Transport Protect the unit from external forces (blows, shocks, vibration). On receipt of the product, check that the delivery is complete, see page  2 (Part designa- Factory Mutual Research Class: 7400 and 7411 tions). Report any transport damage immediately. Safety overpressure slam shut valves.