Condensing unit and refrigeration system
Table of Contents

Advertisement

Connect correctly rated over current protection device in the service line to the service line J-
box on the condensing unit.
After routing condensate line from drain pan of evaporator coil, seal around all refrigeration,
electrical and drain lines with silicone or butyl caulking.
● Start compressor and allow to run at least 24 hours before placing product into the walk-in.
During the testing period you should:
Check the temperature holding range against the control setting.
On low temperature units, check the defrost control system to see that all ice is removed from
the coil during each defrosts cycle.
Perform checks of door operation and all other component operations.
These particular systems are pre-charged at the factory with proper refrigerant, but should be
operationally checked as per page 11, A.6 and A.7.
5/16 Rev. B 57-02497