Connect correctly rated over current protection device in the service line to the service line J-
●
box on the condensing unit.
After routing condensate line from drain pan of evaporator coil, seal around all refrigeration,
●
electrical and drain lines with silicone or butyl caulking.
● Start compressor and allow to run at least 24 hours before placing product into the walk-in.
During the testing period you should:
Check the temperature holding range against the control setting.
●
On low temperature units, check the defrost control system to see that all ice is removed from
●
the coil during each defrosts cycle.
Perform checks of door operation and all other component operations.
●
These particular systems are pre-charged at the factory with proper refrigerant, but should be
operationally checked as per page 11, A.6 and A.7.