6. Preparation for Use

INSPECTION
Prior to installing the Ultrasonic Processor, perform a visual inspection to detect any evidence of
damage, which might have occurred during shipment. Before disposing of any packaging material,
check it carefully for small items.
The Ultrasonic Processor was carefully packed and thoroughly inspected before leaving our factory.
The carrier, upon acceptance of the shipment, assumed responsibility for its safe delivery. Claims for
loss or damage sustained in transit must be submitted to the carrier.
If damage has occurred, contact your carrier within 48 hours of the delivery date. DO NOT OPERATE
DAMAGED EQUIPMENT. Retain all packing materials for future shipment.
ELECTRICAL REQUIREMENTS
The Ultrasonic Processor requires 24 volts DC. A universal 100V~240V, 50/60 Hz AC to DC switch-
mode power supply capable of delivering 24 volts at 2.5 amperes is supplied with your system.
If it is necessary to convert the unit for different voltage operation, proceed as follows:
1. Ensure that the power cord is not connected to the electrical outlet.
2. Change the electrical power cord or add
required.
INSTALLING THE ULTRASONIC PROCESSOR
The Ultrasonic Processor should be installed in an area that is free from excessive dust, dirt, explosive
and corrosive fumes, and extremes of temperature and humidity. If processing flammable liquids, use
an approved fume hood and do not place the power supply in the fume hood.
When positioning the unit, be sure to leave adequate space behind the unit so that all connections can
be easily disconnected.
WARNING
For your personal safety, do not, under any
circumstances, defeat the grounding feature of the
power cord by removing the grounding prong.
a properly grounded universal AC socket adapter